My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2026
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
E
>
EL PINAL
>
1325
>
2231-2238 – Tiered Permitting Program
>
PR0543720
>
COMPLIANCE INFO_2026
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/21/2026 9:37:58 AM
Creation date
4/16/2026 8:22:38 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2231-2238 – Tiered Permitting Program
File Section
COMPLIANCE INFO
FileName_PostFix
2026
RECORD_ID
PR0543720
PE
2231 - HAZARDOUS WASTE PBR FACILITY
FACILITY_ID
FA0024706
FACILITY_NAME
METAL FINISHING SOLUTIONS - STOCKTON CA
STREET_NUMBER
1325
STREET_NAME
EL PINAL
STREET_TYPE
DR
City
STOCKTON
Zip
95205
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\kblackwell
Supplemental fields
Site Address
1325 1 EL PINAL DR STOCKTON 95205
Suite #
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The following is an itemized list of violations that have not been addressed for METAL <br /> FINISHING SOLUTIONS - STOCKTON CA as of April 06, 2026. <br /> Open violations from November 04, 2025 inspection <br /> OBSERVATION: The facility does not have a waste analysis plan. <br /> REGULATION GUIDANCE: (a)(1) Before an owner or operator transfers,treats, stores or disposes of any hazardous <br /> waste,they shall obtain a detailed chemical and physical analysis of a representative sample of the waste.At <br /> minimum,the analysis shall contain all information that must be known to transfer,treat, store or dispose of the waste <br /> in accordance with this chapter and chapter 18 of this division. <br /> (4)The analysis shall be repeated as necessary to ensure it is accurate and up to date.At a minimum, the analysis <br /> shall be repeated: <br /> (A)when the owner or operator has reason to believe the process or operation generating the hazardous waste has <br /> changed; <br /> (b)The owner or operator shall develop and follow a written waste analysis plan that describes the procedures they will <br /> carry out to comply with subsection (a)of this section. The owner or operator shall keep this plan at the facility.At <br /> minimum,the plan shall specify: <br /> (1)the parameters for which each hazardous waste will be analyzed and the rationale for the parameters(i.e., how <br /> analysis for the parameters will provide sufficient information on the waste's properties to comply with subsection (a)of <br /> this section); <br /> (2)the test methods to be used to test for these parameters; <br /> (3)the sampling and sampling management methods to be used to obtain a representative sample of the waste to be <br /> analyzed.The sampling, planning methodology, equipment, sample processing, documentation and custody <br /> procedures shall be in accordance with either: <br /> (A)one of the sampling methods described in Appendix I of chapter 11 of this division; or(B)an equivalent sampling <br /> method. <br /> (4)The frequency with which the initial analysis of the waste will be reviewed or repeated to ensure the analysis is <br /> accurate and up to date; <br /> CORRECTIVE ACTION: Provide a corrective action statement and supporting documentation to the EHD within 30 <br /> days. <br /> ❑ This violation was corrected ❑This violation will be corrected by(date): <br /> ❑ Supporting documents included <br /> Describe actions taken or will be taken to correct violation: <br /> Page 3 of 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.