My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SR2400376 (3)
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
S
>
STIMSON
>
2000
>
2900 - Site Mitigation Program
>
SR2400376 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/22/2026 1:13:24 PM
Creation date
4/22/2026 12:56:01 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
SR2400376
PE
2900 - Site Mitigation Program
STREET_NUMBER
2000
STREET_NAME
STIMSON
STREET_TYPE
RD
City
STOCKTON
Zip
95206
CURRENT_STATUS
Pending
QC Status
Approved
Scanner
SJGOV\gmartinez
Supplemental fields
Site Address
2000 STIMSON RD STOCKTON 95206
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Remedial Investigation QAPP <br /> Stockton Army Aviation Support Facility,California <br /> Worksheet#12: Measurement Performance Criteria .......................................................................... 52 <br /> Worksheet#13:Secondary Data Uses and Limitations....................................................................... 59 <br /> Worksheet#14& 16: Project Tasks and Schedule.............................................................................. 60 <br /> 14.1 Mobilization.................................................................................................................................. 61 <br /> 14.1.1 Right of Entry Documentation Support.....................................................................................61 <br /> 14.1.2 Health and Safety Requirements..............................................................................................61 <br /> 14.1.3 Additional Personnel Qualifications..........................................................................................62 <br /> 14.1.4 Utility Clearance, Permits,and Notifications............................................................................62 <br /> 14.1.5 Suitable Water Determination...................................................................................................63 <br /> 14.1.6 Site Preparation..........................................................................................................................63 <br /> 14.2 Field Investigation Activities........................................................................................................ 64 <br /> 14.2.1 Field Instrument/Equipment Selection, Calibration, and Quality Control...............................64 <br /> 14.2.2 Potential Release Area Surface Soil Sample Collection ..........................................................64 <br /> 14.2.3 Soil Boring Sample Collection ...................................................................................................65 <br /> 14.2.4 Vertical Aquifer Profiling Grab Groundwater Sample Collection..............................................65 <br /> 14.2.5 Permanent Monitoring Well Installation ...................................................................................66 <br /> 14.2.6 Soil Sample Collection from Permanent Well Borings.............................................................67 <br /> 14.2.7 Permanent Monitoring Well Development................................................................................67 <br /> 14.2.8 Groundwater Sample Collection from Permanent Monitoring Wells......................................68 <br /> 14.2.9 Hydraulic Conductivity(Slug)Tests...........................................................................................69 <br /> 14.2.10 Surface Water,Sediment,Stormwater,and Stormwater-Transported Solids Sample <br /> Collection....................................................................................................................................69 <br /> 14.2.11 Synoptic Groundwater Level Measurements............................................................................70 <br /> 14.2.12 Field Quality Control Samples....................................................................................................70 <br /> 14.2.13 Sample Handling,Storage and Transport.................................................................................71 <br /> 14.2.14 Field Documentation..................................................................................................................71 <br /> 14.2.15 Borehole Abandonment.............................................................................................................71 <br /> 14.2.16 Facility Restoration.....................................................................................................................71 <br /> 14.2.17 Equipment Decontamination.....................................................................................................71 <br /> 14.2.18 Site Survey and Geographic Position Measurement................................................................72 <br /> 14.2.19 Investigation-Derived Waste Management...............................................................................72 <br /> 14.3 Laboratory Analysis...................................................................................................................... 73 <br /> 14.4 Data Management, Review, and Validation............................................................................... 73 <br /> 14.4.1 Data Tracking.............................................................................................................................73 <br /> 14.4.2 Data Review and Validation.......................................................................................................73 <br /> 14.4.3 Data Storage,Archiving, and Retrieval.....................................................................................74 <br /> 14.4.4 Data Security..............................................................................................................................74 <br /> 14.5 Human Health and Ecological Risk Assessment....................................................................... 74 <br /> 14.5.1 Human Health Risk Assessment...............................................................................................75 <br /> 14.5.2 Ecological Risk Assessment......................................................................................................75 <br /> 14.6 Report Preparation ...................................................................................................................... 77 <br /> Worksheet#15: Project Screening Levels and Laboratory-Specific Detection/Quantitation Limits... 78 <br /> 15.1 Target Analyte List for PFAS ........................................................................................................ 78 <br /> 15.2 RI Screening Levels for PFAS...................................................................................................... 78 <br /> 15.3 Ecological Screening Criteria for PFAS ....................................................................................... 78 <br /> PARSONS Table of Contents <br /> Page ii <br />
The URL can be used to link to this page
Your browser does not support the video tag.