My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SR2400376 (3)
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
S
>
STIMSON
>
2000
>
2900 - Site Mitigation Program
>
SR2400376 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/22/2026 1:13:24 PM
Creation date
4/22/2026 12:56:01 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
SR2400376
PE
2900 - Site Mitigation Program
STREET_NUMBER
2000
STREET_NAME
STIMSON
STREET_TYPE
RD
City
STOCKTON
Zip
95206
CURRENT_STATUS
Pending
QC Status
Approved
Scanner
SJGOV\gmartinez
Supplemental fields
Site Address
2000 STIMSON RD STOCKTON 95206
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Remedial Investigation QAPP <br /> Stockton Army Aviation Support Facility,California <br /> 15. 4 Screening Levels for Non-PFAS Compounds.............................................................................. 79 <br /> Worksheet#17 & 18: Sampling Design and Rationale......................................................................112 <br /> 17.1 Potential Release Area Surface Soil Sampling Design and Rationale.................................... 113 <br /> 17.2 Soil Boring Sampling Design and Rationale............................................................................. 114 <br /> 17.3 Vertical Aquifer Profiling Sampling Design and Rationale....................................................... 114 <br /> 17.4 Groundwater Monitoring Well Sampling Design and Rationale.............................................. 115 <br /> 17.5 Hydraulic Conductivity Testing Design and Rationale............................................................. 115 <br /> 17.6 Surface Water, Sediment, Stormwater, and Stormwater-Transported Solids Sampling <br /> Designand Rationale ................................................................................................................ 116 <br /> 17.7 Synoptic Groundwater Gauging Design and Rationale............................................................ 116 <br /> Worksheets#19&30: Sample Containers, Preservation, and Hold Times......................................125 <br /> Worksheet#20: Field Quality Control.................................................................................................. 130 <br /> Worksheet#21: Field Standard Operating Procedures......................................................................133 <br /> Worksheet#22: Field Equipment Calibration, Maintenance, Testing, and Inspection .....................134 <br /> Worksheet#23: Laboratory Standard Operating Procedures............................................................136 <br /> Worksheet#24:Analytical Instrument Calibration.............................................................................139 <br /> Worksheet#25:Analytical Instrument and Equipment Maintenance, Testing, and Inspection.......151 <br /> Worksheets#26& 27: Sample Handling, Custody, and Disposal.....................................................159 <br /> Worksheet#28:Analytical Quality Control and Corrective Action......................................................160 <br /> Worksheet#29: Project Documents and Records..............................................................................174 <br /> Worksheet#31, 32, &33:Assessments and Corrective Action........................................................175 <br /> Worksheet#34: Data Verification &Validation Inputs.......................................................................178 <br /> Worksheet#35: Data Verification Procedures....................................................................................179 <br /> Worksheet#36: Data Validation Procedures......................................................................................180 <br /> Worksheet#37: Usability Assessment................................................................................................182 <br /> References...........................................................................................................................................187 <br /> List of Tables <br /> Table 1-1 Components of the RI QAPP............................................................................................................xiii <br /> Table4-1 Project Personnel ...............................................................................................................................4 <br /> Table 6-1 Communication Pathways and Procedures.....................................................................................10 <br /> Table 10-1 Sensitive Species in San Joaquin County,California......................................................................18 <br /> Table 10-2 PFAS Screening Levels (Soil and Groundwater).............................................................................23 <br /> Table14-1 RI Schedule.......................................................................................................................................60 <br /> Table 15-1 DQLs and Reference Limits for PFAS in Groundwater Samples at ALS Houston.........................80 <br /> PARSONS Table of Contents <br /> Page iii <br />
The URL can be used to link to this page
Your browser does not support the video tag.