My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SR2400376 (3)
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
S
>
STIMSON
>
2000
>
2900 - Site Mitigation Program
>
SR2400376 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/22/2026 1:13:24 PM
Creation date
4/22/2026 12:56:01 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
SR2400376
PE
2900 - Site Mitigation Program
STREET_NUMBER
2000
STREET_NAME
STIMSON
STREET_TYPE
RD
City
STOCKTON
Zip
95206
CURRENT_STATUS
Pending
QC Status
Approved
Scanner
SJGOV\gmartinez
Supplemental fields
Site Address
2000 STIMSON RD STOCKTON 95206
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Remedial Investigation QAPP <br /> Stockton Army Aviation Support Facility,California <br /> Table 15-2 DQLs and Reference Limits for PFAS in Surface Water Samples at ALS Houston.......................83 <br /> Table 15-3 DQLs and Reference Limits for PFAS in Soil Samples at ALS Houston.........................................87 <br /> Table 15-4 DQLs and Reference Limits for PFAS in Sediment Samples for ALS Houston..............................91 <br /> Table 15-5 DQLs and Reference Limits for PFAS in Groundwater Samples at ALS Kelso..............................94 <br /> Table 15-6 DQLs and Reference Limits for PFAS in Surface Water Samples for ALS Kelso...........................97 <br /> Table 15-7 DQLs and Reference Limits for PFAS in Soil Samples at ALS Kelso...........................................100 <br /> Table 15-8 DQLs and Reference Limits for PFAS in Sediment Samples at ALS Kelso..................................103 <br /> Table 15-9 Reference Limits for VOCs in Groundwater Samples at ALS Houston........................................106 <br /> Table 15-10 Reference Limits for TPHs in Groundwater Samples at ALS Houston.........................................107 <br /> Table 15-11 Reference Limits for General Chemistry in Aqueous Samples at ALS Houston .........................108 <br /> Table 15-12 Reference Limits for General Chemistry in Soil Samples at ALS Houston..................................109 <br /> Table 15-13 Reference Limits for General Chemistry in Aqueous Samples at AILS Kelso..............................110 <br /> Table 15-14 Reference Limits for General Chemistry in Soil Samples at ALS Kelso.......................................111 <br /> Table 17-1 Potential Release Area Surface Soil Sampling Design and Rationale........................................117 <br /> Table 17-2 Soil Boring Sampling Design and Rationale.................................................................................118 <br /> Table 17-3 VAP Sampling Design and Rationale.............................................................................................119 <br /> Table 17-4 Groundwater Monitoring Well Installation/Sampling Design and Rationale..............................120 <br /> Table 17-5 Rydberg Creek Basin Stormwater Conveyance Sampling Design and Rationale.......................121 <br /> Table 19-1 Analytical Laboratory Contact and Information ............................................................................125 <br /> Table 19-2 Sample Containers, Preservation, and Hold Time for ALS Houston............................................126 <br /> Table 19-3 Sample Containers, Preservation, and Hold Time for ALS Kelso.................................................128 <br /> Table 20-1 Field Quality Control Samples........................................................................................................130 <br /> Table 20-2 Measurement Performance Criteria-Field Quality Control Samples..........................................131 <br /> Table 21-1 Field Standard Operating Procedures...........................................................................................133 <br /> Table 22-1 Field Equipment Calibration, Maintenance,Testing, and Inspection..........................................134 <br /> Table 23-1 Laboratory Standard Operating Procedures.................................................................................136 <br /> Table 24-1 Analytical Instrument Calibration ..................................................................................................139 <br /> Table 25-1 Analytical Instrument and Equipment Maintenance, Testing, and Inspection at ALS <br /> Houston...........................................................................................................................................151 <br /> Table 25-2 Analytical Instrument and Equipment Maintenance,Testing, and Inspection at ALS Kelso.....155 <br /> Table 29-1 Project Documents and Records...................................................................................................174 <br /> Table31-1 Assessments...................................................................................................................................175 <br /> Table 31-2 Assessment Response and Corrective Action ..............................................................................176 <br /> Table 31-3 Laboratory Assessments................................................................................................................177 <br /> Table 35-1 Data Verification Procedures.........................................................................................................179 <br /> Table 36-1 Data Validation Codes and Definitions.........................................................................................181 <br /> PARSONS Table of Contents <br /> Page iv <br />
The URL can be used to link to this page
Your browser does not support the video tag.