Laserfiche WebLink
January 25, 2016 Inspection and Maintenance Plan <br /> o Replacing vault gaskets <br /> o Repairing or replacing damaged bollards <br /> • Re-development of the well <br /> • Re-mark the measurement point and re-survey the measurement point elevation if the well <br /> casing has been damaged <br /> If the well is damaged beyond repair,the damaged well should be properly abandoned. If the <br /> damaged well is part of the active monitoring network,a replacement monitoring well should be <br /> installed after approval from the RWQCB. <br /> Hydro Focus, Inc. 2 <br />