Ms.�atalia Subbotnikova,REHS Geosyntec° <br /> May 5, 2026 consultants <br /> Page 3 <br /> FAA NOTIFICATION AND PERMITS <br /> The Landfill lies near the Stockton Municipal airport; therefore, Federal Aviation Administration <br /> (FAA)clearance must be obtained prior to the start of drilling activities.All appropriate paperwork <br /> and notices shall be filed with the FAA and the Stockton Municipal airport prior to commencement <br /> of work. The FAA may take up to 45 days to review the permit documents. <br /> HEALTH AND SAFETY PLAN <br /> A health and safety plan (HASP) will be prepared prior to beginning the proposed GCCS <br /> construction and improvements. The HASP describes potential hazards and outlines site-specific <br /> protection, personnel training and preparedness, environmental monitoring and record keeping <br /> provisions. <br /> REPORTING <br /> An SVE-11 Construction Report(Report) including drilling activities and well installation details, <br /> as well as pipe installation activities will be prepared for submittal to Forward. Boring logs and <br /> well]completion diagrams will be submitted as part of the Report. The Report will be prepared by <br /> or under the supervision of a California Professional Engineer or Geologist. <br /> If you have any questions,please do not hesitate to contact Aklilu Tesfamichael at 510-285-2683. <br /> �RQFE k Sincerely, <br /> VIES <br /> a No.91252 rn <br /> Exp. _613 i/2d26 <br /> CIVIL Aklilu Tesfamichael, PE(CA) <br /> �lfQFCA1`E� Senior Engineer <br /> CC: Osvaldo Cordero,Forward Landfill,Environmental Manager <br /> Attachment A-Final Construction Drawings <br /> Forward DPT Investigation and SVE-I 1 Installation Work Plan <br />