My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/13/2026 5:03:48 PM
Creation date
7/9/2026 2:22:06 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0440005
PE
4433 - LANDFILL DISPOSAL SITE
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
201060013, 5
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\sballwahn
Supplemental fields
Site Address
9999 AUSTIN RD MANTECA 95336
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2867
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ms.Natalia Subbotnikova,REHS Geosyntec° <br /> May 5, 2026 consultants <br /> Page 2 <br /> 11 construction details including total depth and screened intervals. The DPT borings will be <br /> destroyed in accordance with San Joaquin County standards with neat cement grout. <br /> SV�41 INSTALLATION RATIONALE <br /> The 2026 GCCS improvement and expansion includes the installation extraction well SVE-11. <br /> The well is designed to control and minimize LFG surface emissions and migration. SVE-11 <br /> extraction well will be installed at the perimeter of the landfill outside of the waste limit to mitigate <br /> LFG migration in the vicinity of GP-10 (see Attachment A). The proposed SVE well will be <br /> connected to a header pipe via a lateral lateral pipe to route the collected LFG to the existing flare <br /> station and/or to the LFGTE Plant. <br /> SVE-11 CONSTRUCTION DETAILS <br /> The',total boring depth of the planned SVE well is n 37 ft bgs,which will be advanced using a 12" <br /> diameter hollow stem auger. SVE-11 will be constructed using 4-inch-diameter Schedule 80 <br /> (SC"80) polyvinyl chloride (PVC) solid and slotted pipe casing. The slotted pipe section will <br /> extend from 18 to 36 ft bgs. <br /> The'pipe casings will be capped at the bottom with SCH80 PVC cap, glued and secured with 3 lag <br /> screws. The well casing will be placed at the center of the wellbore and suspended so the bottom <br /> of the casing is approximately 1 foot above the bottom of the wellbore. The annulus around the <br /> perforated well casing will be backfilled with a gravel pack as shown in the drawings. A <br /> geocomposite donut will be installed above the gravel, followed by a layer of 1 ft of soil 13 ft- <br /> thick bentonite plug. The bentonite plug will be formed by evenly distributing 6-inch lifts of <br /> granulated bentonite or bentonite chips between the well casing and the walls of the borehole. The <br /> bentonite will be thoroughly mixed and hydrated in accordance with manufacturer <br /> recommendations before placement. The bentonite plug will be allowed to cure for at least 20 <br /> minutes.The bentonite plug will extend from 1 to 13 ft bgs,and a neat cement grout will be placed <br /> fro Im 0 to 1 ft bgs. <br /> Fol owing placement of the cement grout, a 5-foot by 5-foot safety grate will be installed, an <br /> additional 1 ft of soil will be placed above the safety grate, and above the grate, a 20 ft by 20 ft <br /> geomembrane wellbore seal will be installed. Details are shown in Sheet 5 of Attachment A. <br /> The SVE well will be fitted with a 2-inch QED style wellhead that will be connected to an LFG <br /> lateral pipe, as shown in the drawings. The lateral pipe will be tied-into an existing LFG header <br /> pipe as shown in the drawings (Sheet 3). <br /> Forward DPT Investigation and SVE-1 I Installation Work Plan <br />
The URL can be used to link to this page
Your browser does not support the video tag.