My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
A
>
AUSTIN
>
9999
>
4400 - Solid Waste Program
>
PR0440005
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/13/2026 5:03:48 PM
Creation date
7/9/2026 2:22:06 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0440005
PE
4433 - LANDFILL DISPOSAL SITE
FACILITY_ID
FA0004516
FACILITY_NAME
FORWARD DISPOSAL SITE
STREET_NUMBER
9999
STREET_NAME
AUSTIN
STREET_TYPE
RD
City
MANTECA
Zip
95336
APN
201060013, 5
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\sballwahn
Supplemental fields
Site Address
9999 AUSTIN RD MANTECA 95336
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2867
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Geosyntec'-' <br /> consultants <br /> 7.2 Emergency Response Equipment <br /> Emergency response equipment will be maintained in the work area as necessary for this <br /> project. Examples of emergency response equipment include first aid kits, fire <br /> extinguishers (Type ABC), and eyewash bottles. <br /> 8. KEY PERSONNEL AND HEALTH AND SAFETY RESPONSIBILITIES <br /> Project personnel and their responsibilities in regard to health and safety concerns for this <br /> 1'project are as follows: <br /> Project Manager(PM): Katherine Clark <br /> • Approve this HASP and amendments, if any; <br /> • Monitor the field logbooks for health and safety work practices employed; <br /> • Coordinate with SHSO so that emergency response procedures are implemented; <br /> • Check that corrective actions are implemented; <br /> • Check and document that qualified personnel receive this plan and are aware of <br /> its provisions and potential hazards associated with site operations, and that they <br /> are instructed in safe work practices and familiar with emergency response <br /> procedures; and <br /> • Provide appropriate monitoring,PPE,and decontamination materials. <br /> Site Health and Safety Officer(SHSO): Kathryn VonSydow <br /> • Prepare and implement project HASP and amendments, if any, and report to the <br /> PM for action if deviations from the anticipated conditions exist and authorize the <br /> cessation of work if necessary; <br /> • Check that site personnel meet the training and medical requirements; <br /> • Conduct pre-entry briefing and daily tailgate safety meetings; <br /> • Check that monitoring equipment and PPE are operating correctly according to <br /> manufacturer's instructions and such equipment is utilized by on-site personnel. <br /> Calibrate or check calibration of monitoring equipment and record results; <br /> • Check that decontamination procedures are being implemented; <br /> SAC373 HASP 14 04/2/2026 <br />
The URL can be used to link to this page
Your browser does not support the video tag.