Laserfiche WebLink
Geosyntec'-' <br /> consultants <br /> 7.2 Emergency Response Equipment <br /> Emergency response equipment will be maintained in the work area as necessary for this <br /> project. Examples of emergency response equipment include first aid kits, fire <br /> extinguishers (Type ABC), and eyewash bottles. <br /> 8. KEY PERSONNEL AND HEALTH AND SAFETY RESPONSIBILITIES <br /> Project personnel and their responsibilities in regard to health and safety concerns for this <br /> 1'project are as follows: <br /> Project Manager(PM): Katherine Clark <br /> • Approve this HASP and amendments, if any; <br /> • Monitor the field logbooks for health and safety work practices employed; <br /> • Coordinate with SHSO so that emergency response procedures are implemented; <br /> • Check that corrective actions are implemented; <br /> • Check and document that qualified personnel receive this plan and are aware of <br /> its provisions and potential hazards associated with site operations, and that they <br /> are instructed in safe work practices and familiar with emergency response <br /> procedures; and <br /> • Provide appropriate monitoring,PPE,and decontamination materials. <br /> Site Health and Safety Officer(SHSO): Kathryn VonSydow <br /> • Prepare and implement project HASP and amendments, if any, and report to the <br /> PM for action if deviations from the anticipated conditions exist and authorize the <br /> cessation of work if necessary; <br /> • Check that site personnel meet the training and medical requirements; <br /> • Conduct pre-entry briefing and daily tailgate safety meetings; <br /> • Check that monitoring equipment and PPE are operating correctly according to <br /> manufacturer's instructions and such equipment is utilized by on-site personnel. <br /> Calibrate or check calibration of monitoring equipment and record results; <br /> • Check that decontamination procedures are being implemented; <br /> SAC373 HASP 14 04/2/2026 <br />