My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SR2400516
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
F
>
FYFFE
>
0
>
2900 - Site Mitigation Program
>
SR2400516
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2026 9:21:46 AM
Creation date
7/17/2026 9:13:16 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
SR2400516
PE
2900 - Site Mitigation Program
STREET_NUMBER
0
Direction
W
STREET_NAME
FYFFE
STREET_TYPE
ST
City
STOCKTON
Zip
95203
APN
16203007
CURRENT_STATUS
Active
QC Status
Approved
Scanner
SJGOV\gmartinez
Supplemental fields
Site Address
W Fyffe ST STOCKTON 95203
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
203
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• August 2023 <br /> COMMUNITY UPDATE <br /> Department of Toxic Substances Control-Our mission is to protect the people, communities, and environment of California from <br /> harmful chemicals by cleaning up contaminated sites, enforcing hazardous waste laws, and compelling the development of safer products. <br /> Draft Remedial Action Plan for Port Of Stockton Site 47 <br /> Soil Remediation <br /> The California State Department of Toxic Substances Control (DTSC) is sending out this Community <br /> Update to let the community know about the draft Remedial Action Plan (RAP) or cleanup plan for the <br /> Port of Stockton. The Port of Stockton is located at 2201 W. Washington Street, Stockton, California, <br /> 95203 and proposing to excavate contaminated soil from the Site 47 on the southern portion of <br /> Rough and Ready Island. The soil would be consolidated under an existing durable cover or clean <br /> soil and/or a planned building to prevent direct exposure. The covered areas would be inspected and <br /> maintained regularly. The draft RAP does not include a remedy for groundwater, which remains <br /> under investigation. <br /> PUBLIC COMMENT PERIOD and PUBLIC MEETING <br /> DTSC will accept public comments on the draft RAP for the Port of Stockton Site 47 beginning <br /> August 10, 2023 - September 12, 2023. Please send all written comments to Shahid Mahmood, <br /> Project Manager at 8800 Cal Center Drive, Sacramento, California 95826; or via email to <br /> Shahid.Mahmood(a-)dtsc.ca.go\,. All comments must be received by September 12, 2023. <br /> A virtual public meeting and hearing will be held via Zoom on Wednesday, August 30, 2023, starting <br /> at 6 pm. The meeting will include a presentation and question-and-answer session, followed by the <br /> public hearing. Public comments will be taken at the hearing and DTSC will respond to these <br /> comments in writing. To register, go to https://tinyurl.com/umhtv8nf. <br /> Site History and Background <br /> Rough and Ready Island was originally a marshy grassland and swamp and was often flooded over <br /> by the San Joaquin River. The Island was a home for waterfowl and marsh creatures, and a stopping <br /> point for migratory birds. In the 1800s, levees were constructed around the Island to enable farming. <br /> The Department of Defense first established a presence on the Island after World War I. During <br /> World War II, the military commissioned the Island as the U.S. Naval Supply Annex, Stockton. <br /> Following the end of the Korean conflict, supply depot activity slowed, and the command changed <br /> over time. The Department of Defense released wastes in certain portions of the Landfill Area. While <br /> DOD released wastes elsewhere on the Island, the RAP, and therefore this Community Update, is <br /> focused on the Landfill Area. <br /> The Navy managed the depot until July 2002, when their operations ceased. Under four separate <br /> transfer actions in 2000, 2002, 2003 and 2011, the United States Navy transferred Rough & Ready <br /> Island to the Port of Stockton. Rough & Ready Island is now used to provide maritime support for the <br /> Port. <br />
The URL can be used to link to this page
Your browser does not support the video tag.