Historical Files from Rough and Ready Island Sites(RRI)
<br /> Port of Stockton,Stockton,CA
<br /> 06/13/2023 Update
<br /> No. DATE SITE TITLE AUTHOR RECIPIENT
<br /> December 13, ERAS Review: Draft Electronic Files for DTSC, cc: POS,
<br /> 1184 Site 47 a Focused Feasibility Study,Site 47, DTSC
<br /> 2019 Rough and Ready Island Geosyntec
<br /> December 13,
<br /> Draft Tables for the Focused Feasibility DTSC, cc: POS,
<br /> 1185 Site 47 Study at Site 47, Rough and Ready DTSC
<br /> 2019 Geosyntec
<br /> Island, Port of Stockton
<br /> Draft Human Health Risk Tables and
<br /> December 17, Figures for Site Working Draft Focused DTSC, cc: POS,
<br /> 1186 2019 Site 47 Feasibility Study at Rough and Ready DTSC Geosyntec
<br /> Island
<br /> 1187 December 18, Site 47 Email: Site Background Information DTSC Geosyntec,cc: POS,
<br /> 2019 CVRWQCB
<br /> Email: Site 47 Water Main Break Geosyntec DTSC,cc: CVRWQCB,
<br /> 1200 February 27, 2020 Site 47 Excavation Status POS
<br /> 1208 April 20, 2020 Site 47 Draft Site 47 Focused Feasibility Study Geosyntec POS
<br /> 1229 June 19, 2020 Site 47 Comments on April 20, 2020 Draft Site DTSC POS, cc: Geosyntec,
<br /> 47 Focused Feasibility Study CVRWQCB
<br /> 1230 June 19, 2020 Site 47 Comments on April 20, 2020 Draft Site CVRWQCB POS, cc: Geosyntec,
<br /> 47 Focused Feasibility Study DTSC
<br /> Due Diligence Geotechnical and DTSC, cc: POS,
<br /> 1242 August 4, 2020 Site 47 Limited Environmental Investigation Haley&Aldrich Geosyntec,
<br /> Work Plan CVRWQCB
<br /> Approval of August 4, 2020 Due POS, cc: Geosyntec,
<br /> 1243 August 4, 2020 Site 47 Diligence Work Plan DTSC H&A,CVRWQCB
<br /> DRAFT Work Plan Addendum for DTSC, CVRWQCB,cc:
<br /> 1249 August 27, 2020 Site 47 Potential Remedial Boundary Geosyntec POS
<br /> Delineation at Site 47
<br /> September 9, Work Plan Addendum for Potential DTSC, CVRWQCB,cc:
<br /> 1252 2020 Site 47 Remedial Boundary Delineation at Site Geosyntec POS
<br /> 47
<br /> Report on Limited Environmental
<br /> 1258 September 29,2020 Site 47 Investigation Report, Prospective Lease Haley&Aldrich DTSC
<br /> Portion of Site 47
<br /> September 30, Transmittal of Site 47 Remedial
<br /> 1259 Site 47 Geosyntec DTSC, CVRWQCB
<br /> 2020 Boundary Investigation Data
<br /> Navy Correspondence RE: Site 47 PFAS DTSC, CVRWQCB,
<br /> 1262 October 9, 2020 Site 47 PA Report NAVFAC POS,Geosyntec
<br /> Approval of Site 47 Data Gaps POS, cc: Geosyntec,
<br /> 1268 October 14,2020 Site 47 Investigation Work Plan DTSC CVRWQCB
<br /> December 22, Comments on Development Plan Draft
<br /> 1283 2020 Site 47 Schedule DTSC POS
<br /> Draft Revised Site 47 Remedial DTSC, CVRWQCB,cc:
<br /> 1323 June 30,2021 Site 47 Investigation/Focused Feasibility Study Geosyntec POS
<br /> for Soil
<br /> Page 4 of 6