Laserfiche WebLink
Historical Files from Rough and Ready Island Sites(RRI) <br /> Port of Stockton,Stockton,CA <br /> 06/13/2023 Update <br /> No. DATE SITE TITLE AUTHOR RECIPIENT <br /> Acknowledgement of Revised Draft Site <br /> POS, cc: Geosyntec, <br /> 1337 August 24, 2021 Site 47 47 Remedial Investigation/Focused CVRWQCB DTSC <br /> Feasibility Study for Soil <br /> 1350 October 15, 2021 Site 47 DTSC Comments on Revised Draft Site DTSC POS, Geosyntec, cc: <br /> 47 RI/FFS for Soil CVRWQCB <br /> 1359 January 14, 2022 Site 47 Draft Final RI/FFS Report for Soil Geosyntec DTSC, CVRWQCB,cc: <br /> POS <br /> 1366 February 28, 2022 Site 47 DTSC Comments on Draft Final RI/FFS DTSC POS, cc: Geosyntec, <br /> Report for Soil CVRWQCB <br /> Final Site 47 Remedial DTSC, CVRWQCB,cc: <br /> 1367 March 18, 2022 Site 47 Investigation/Focused Feasibility Study Geosyntec POS <br /> for Soil <br /> 1368 March 21,2022 Site 47 Draft Remedial Action Plan for Soil, Site DTSC and POS,cc: Geosyntec <br /> 47 CVRWQCB <br /> 1373 April 22, 2022 Site 47 Comments on March 21, 2022 DTSC POS, cc: Geosyntec, <br /> Remedial Action Plan for Area 47 CVRWQCB <br /> 1386 August 1, 2022 Site 47 Notice of Repair to Subsurface Fire Line Geosyntec DTSC <br /> at Site 47 <br /> September 22, Response: Notice of Repair to <br /> 1392 2022 Site 47 Subsurface Fire Line at Site 47 DTSC Geosyntec, cc: POS <br /> 1395 October 14, 2022 Site 47 CVRWQCB Comments on Draft CVRWQCB POS, cc: Geosyntec, <br /> Remedial Action Plan for Soil,Site 47 DTSC <br /> 1416 January 31, 2023 Site 47 Response to Comments on Draft POS DTSC, CVRWQCB, cc: <br /> Remedial Action Plan for Soil, Site 47 Geosyntec <br /> 1423 March 20, 2023 Site 47 Response to Comments on and Revised Geosyntec DTSC, CVRWQCB, cc: <br /> Draft Site 47 Remedial Action Plan POS <br /> Draft Work Plan Addendum for Pre- <br /> 1424 March 20, 2023 Site 47 Construction Groundwater Monitoring Geosyntec DTSC, CVRWQCB <br /> Event at Site 47 <br /> Deliverable Request for Public Geosyntec,cc: POS, <br /> 1425 March 20, 2023 Site 47 Comment Period DTSC CVRWQCB <br /> 1430 April 20, 2023 Site 47 Comments on Revised Draft Site 47 DTSC POS, cc: Geosyntec, <br /> Remedial Action Plan CVRWQCB <br /> 1431 April 28, 2023 Site 47 Comments on Revised Draft Site 47 CVRWQCB DTSC, POS, cc: <br /> Remedial Action Plan Geosyntec <br /> Concurrence With Draft Work Plan <br /> 1434 May 1, 2023 Site 47 Addendum for Pre-Construction DTSC POS, cc: Geosyntec, <br /> Groundwater Monitoring Event at Site CVRWQCB <br /> 47 <br /> 1442 May 16, 2023 Site 47 Response to Comments on Draft RAP Geosyntec DTSC, CVRWQCB,cc: <br /> and Revised RAP POS <br /> Page 5 of 6 <br />