Laserfiche WebLink
1. INTRODUCTION <br /> This Remedial Action Plan for Soil Site 47(Site 47 RAP)was prepared to select a remedy for <br /> soil, and sediment within Site 47 and adjacent areas. Site 47 is located on Rough and Ready <br /> Island (RRI) and is owned and operated by the Port of Stockton (Port). The administrative <br /> address associated with Port operations on RRI is 2201 West Washington Street, Stockton, <br /> California(Figure 1). <br /> 1.1 Purpose of the RAP <br /> This Site 47 RAP was prepared to select a remedy for hazardous substances present in soil and <br /> sediment at Site 47 and adjacent areas. The remedy would be implemented to support <br /> redevelopment of Site 47 for commercial/industrial use. <br /> This Site 47 RAP summarizes information presented in the Remedial Investigation/Focused <br /> Feasibility Study for Soil, Site 47(Site 47 RUFFS) (Geosyntec Consultants, Inc. [Geosyntec], <br /> 2022), including the nature and extent of contamination, potential risks to humans and wildlife, <br /> and the remedial alternatives to address the potential risks. In addition, this Site 47 RAP <br /> identifies a recommended remedial alternative, explains the basis for its selection as the remedy, <br /> and describes the conceptual plan for site remediation. <br /> The remedy proposed in this Site 47 RAP addresses contaminants in soil and sediment, and does <br /> not address groundwater at Site 47. The Site 47 RI/FFS briefly summarized the nature and extent <br /> of groundwater contamination, but did not evaluate remedial alternatives for groundwater. In <br /> 2016, the California Department of Toxic Substances Control (DTSC) and the Central Valley <br /> Regional Water Quality Control Board(CVRWQCB) concurred that arsenic concentrations in <br /> RRI groundwater, including at Site 47, reflected background conditions. The Port is planning to <br /> conduct an additional groundwater investigation at Site 47, and an island-wide assessment of <br /> background concentrations of additional metals in groundwater. Site 47 groundwater conditions <br /> will be evaluated once these investigations are completed. Additional information is provided in <br /> Section 2.3. <br /> The proposed remedy is based on information in the Administrative Record for Site 47. The <br /> Administrative Record List identifies the documents that were relied on or considered when <br /> proposing the remedy and is provided in Appendix B. <br /> 1.2 Regulatory Framework <br /> The United States Department of Defense (DOD)began conducting environmental investigations <br /> of RRI in 1984. DTSC and CVRWQCB began providing oversight of the United States <br /> Department of the Navy (Navy)'s cleanup activities shortly thereafter. DOD transferred <br /> ownership of RRI to the Port through the United States Department of Transportation Maritime <br /> Administration(MARAD) in 2000, 2002, 2003, and 2011. The property transferred in 2003 and <br /> 2011 was contaminated and required investigation and cleanup for which the Port took <br /> responsibility. The Port, DTSC, and the CVRWQCB entered into consent agreements (a 2003 <br /> Consent Agreement and a 2009 Consent Agreement)to provide for DTSC and the CVRWQCB <br /> to provide regulatory oversight of the cleanup. Under the terms of the consent agreements, the <br /> Site 47 RAP for Soil 1 October 2023 <br />