5. PRELIMINARY REMEDIAL DESIGN FOR SELECTED REMEDY <br /> This section presents a preliminary remedial design for the various phases of the selected <br /> remedy. In accordance with DTSC RAP guidance, the following sections describe methods that <br /> will be employed during the remedial action to ensure the health and safety of workers and the <br /> public. The selected remedy would be implemented in two phases. The initial phase would focus <br /> on the Project Sierra development area, and the second phase would address the remaining areas <br /> requiring remediation. Additional information will be presented in the RDIP for each phase; <br /> these two plans will be completed later. <br /> 5.1 Plans and Permits <br /> The RDIPs will present the design of the selected remedy, including details on excavation, <br /> handling and on-site transport, placement and consolidation of excavated soil, dewatering (if <br /> needed), stockpile management, calculation packages, drawings, technical specifications, and the <br /> supplemental plans that are required to implement the remedy. The supplemental plans include, <br /> but are not limited to, the following: <br /> • Health and Safety Plan—Addresses potential hazards associated with the remedy <br /> implementation. <br /> • Construction Quality Assurance (CQA) Plan—Presents the CQA program for the <br /> oversight of installation methods and provisions for the protection of remedy <br /> components during installation. The CQA program provides assurance that system <br /> components are installed in accordance with drawings and specifications. <br /> • Operation and Maintenance Plan(OMP)—Discusses the monitoring and maintenance <br /> procedures and checklists for the implemented remedy(see Section 7 for further <br /> information). <br /> • Stormwater Pollution Prevention Plan (SWPPP)—The SWPPP addresses the <br /> management and sampling of stormwater, which may occur during remedy <br /> implementation activities. BMPs that should be considered and implemented during <br /> work activities will be designed by a qualified stormwater professional for inclusion <br /> in the SWPPP. <br /> • Community Air Monitoring/Dust Control Plan—Addresses dust control and <br /> perimeter air monitoring requirements during work activities. <br /> The Port or the Project Sierra developer will obtain permits as required to comply with federal, <br /> state, and local regulations. Consultation is currently underway with the following government <br /> agencies to obtain the required permits or approvals: <br /> • San Joaquin Council of Governments—Incidental Take Minimization Measures that <br /> comply with the San Joaquin County Multi-Species Habitat Conservation and Open <br /> Space Plan; <br /> Site 47 RAP for Soil 18 October 2023 <br />