• San Joaquin County Environmental Health Department—Permits to destroy existing <br /> groundwater monitoring wells and install new monitoring wells within Project Sierra <br /> development area. <br /> • CVRWQCB—SWPPP to comply with the Construction General Permit Order No. <br /> 2009-0009-DWQ; <br /> • San Joaquin Valley Air Pollution Control District (SJVAPCD)—Dust Control Plan <br /> that complies with SJVAPCD Regulation VIII—Fugitive PM10 Prohibitions; and <br /> • City of Stockton—Building permit that complies with the City of Stockton Municipal <br /> Code. <br /> Appendix F further describes the environmental management measures consistent with the Port's <br /> California Environmental Quality Act(CEQA) document, TC NO. CAL. Development <br /> Warehousing and Distribution Facility Project Environmental Impact Report. <br /> The RDIP for the second remediation phase (outside the Project Sierra development)will include <br /> a soil sampling plan to verify the extent of arsenic in shallow soil (0 to 2 feet bgs) within the <br /> paved warehouse area west of Site 47. This paved area is currently included within the remedial <br /> boundary based on the assumed presence of arsenic exceeding the remediation goal; however, as <br /> shown in Figure 6b, existing soil data is limited to unpaved areas bounding the paved warehouse <br /> area. The sampling plan will define objectives to determine if the RAOs can be achieved solely <br /> by the land use and activity restrictions set forth in the LUC, or if repair, inspections, and <br /> maintenance of the existing covers is also required. <br /> Upon DTSC and CVRWQCB approval, the remedy will be implemented in accordance with the <br /> RDIPs and in compliance with all required permits. The remedial action contractor will be <br /> licensed by the State of California to conduct hazardous waste removal and will use qualified, <br /> Hazardous Waste Operations (HAZWOPER)12-trained workers. <br /> 5.2 Utility Clearance <br /> Prior to ground disturbing activities, Underground Service Alert (USA) will be contacted at least <br /> 48 hours in advance to identify the location of utilities that enter the property. All proposed <br /> excavation areas will be clearly marked with white paint or surveyors flagging, as required by <br /> USA. USA will contact all utility owners of record within the Site 47 vicinity and notify them of <br /> the intent to excavate. All utility owners will be expected to clearly mark the position of their <br /> utilities on the ground surface throughout the designated areas. In addition, a private utility <br /> locator will conduct a field survey to identify subsurface utilities in the excavation areas. <br /> 5.3 Site Preparation <br /> Prior to construction, appropriate engineering controls (e.g., fencing and signs)would be <br /> implemented to restrict access of unauthorized personnel to the work area. A land survey would <br /> 12 HAZWOPER:Hazardous Waste Operations trained per Title 29 Code of Federal Regulations Section 1910.120 <br /> Site 47 RAP for Soil 19 October 2023 <br />