• Conclusions and recommendations associated with the goals and objectives in the <br /> RAP. <br /> For each phase of the remediation, a draft RACR will be provided to DTSC and CVRWQCB for <br /> review and concurrence, followed by final submittal of the RACR. This Final RACR will be <br /> signed and stamped by a California-registered Professional Engineer that has reviewed and <br /> verified the remedial action activities. <br /> Site 47 RAP for Soil 22 October 2023 <br />