Laserfiche WebLink
KL E/NFEL OER <br /> Bright People.Right Solutions. <br /> Job Loss Analysis <br /> Job Task Sampling - Groundwater <br /> Origination Date: February 27, 2006 Revision#3 Revision Date: December 14, 2012 <br /> Development Team: Scott Smith, Rob Croyden Review Team: Bert Vogler, Scott Smith, Group: Environmental <br /> Jenny Meyer <br /> Required Equipment for task(check specific job steps below for required PPE) <br /> X Reflective Vest Goggles Supplied Air Respirator X Other:as client&/or condition requires Hard hat,face shield <br /> Hard Hat Face Shield Air Purifying Respirator Client Specific: <br /> X Steel Toed Boots Life/Harness Protective Clothing Material: <br /> X Safety Glasses Hearing Protection X Gloves Material: Nitrile,leather,Kevlar <br /> Job Steps Risks/Hazards Quality/Safe Work Practices <br /> Follow quality/safe work practices listed in the"General Site Activities"JLA and <br /> Pre-Construction Health and Safety those appropriate for each specific task. Don appropriate/minimum required <br /> Briefing/General Site Activities Review hazards listed in"General Site Activities"JLA PPE for the tasks below,as listed in the"Minimum Required Equipment"section <br /> above. <br /> Inhalation of exhaust or contact of sample with exhaust When running the vehicle(for use as a power source),position the exhaust of <br /> the vehicle away from or downwind of the work area. <br /> Positioning work vehicle Be aware of traffic conditions throughout the duration of the groundwater <br /> sampling task. Set up work vehicle inside work zone and use vehicle to act as <br /> Struck by vehicle a barricade if possible. Don minimum required PPE for the task. Chock wheels <br /> and place parking brake on if vehicle if engine is left running during work or if <br /> placed in neutral. <br /> A"Well Vault Key"is the preferred tool for opening steel road box. A ratchet <br /> with an extension and a small pry bar can be used for smaller manholes(up to <br /> Hand and leg abrasions,cuts,bruises,body pinch points 12"). For manholes over 12",a large pry bar must be used. Wear leather work <br /> gloves or Kevlar gloves to prevent abrasions of the hand whenever <br /> opening/closing the well vault and when inserting hands into well vault. <br /> Open/close well vaults and manholes <br /> Page 1 of 4 <br />