My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WP0041601
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
CHRISMAN
>
24427
>
2900 - Site Mitigation Program
>
WP0041601
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2026 2:05:12 PM
Creation date
7/17/2026 1:57:04 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
WP0041601
PE
2905 - SOIL BORING / PROBE - SITE MITIGATION
STREET_NUMBER
24427
Direction
S
STREET_NAME
CHRISMAN
STREET_TYPE
RD
City
TRACY
Zip
94378-
APN
25016011
CURRENT_STATUS
Active
QC Status
Approved
Scanner
SJGOV\gmartinez
Supplemental fields
Site Address
24427 S CHRISMAN RD TRACY 94378-
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
79
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Safety and Health Plan <br /> Premium California Orchards Tracy, California Irerracon <br /> January 8, 2021 Terracon Project No. NA207103 <br /> by personnel working within 10 feet of any active roadway or when vehicles or mobile <br /> equipment are present onsite. <br /> The SSO will ensure that unauthorized personnel do not enter the work zone. Authorized <br /> visitors will be briefed on site contaminants, personal protective equipment requirements <br /> and the decon provisions of this Plan. <br /> The SSO will continually inspect the work area for infractions of Health and Safety <br /> requirements contained in this plan. <br /> The SSO will investigate and immediately report all accidents to the Corporate Safety and <br /> Health Manager. <br /> Site activities will be conducted only during daylight hours unless adequate portable <br /> lighting is mobilized to the project site. <br /> The "buddy system" will be observed at all times during intrusive site investigations. A <br /> minimum of two people will work together and remain within eye sight or not greater than <br /> 100 ft. apart. <br /> 12.0 SITE CONTROL <br /> An exclusion zone, contaminant reduction zone and a support zone will be established whenever <br /> project activities require Level C or Level B personal protective equipment. Defined access and <br /> egress points will be established and personnel will enter only through those points. <br /> If unauthorized personnel attempt to enter the exclusion zone, the SSO will verbally inform the <br /> individual(s) to leave the project site. If unauthorized individuals refuse to leave the exclusion <br /> zone or are considered in danger or pose danger to project personnel, the SSO will cease project <br /> activities (i.e., shut down drill rigs, excavation equipment, etc.) and notify the client representative <br /> or the local police of the situation. Site activities will not resume until unauthorized personnel have <br /> left the project site. <br /> 13.0 AIR MONITORING AND SITE ACTION LEVELS <br /> This air monitoring protocol is designed to prevent personnel exposure to airborne contaminants <br /> in excess of established permissible exposure limits. The results of field air monitoring will be <br /> used to determine the adequacy of initial personal protective equipment selection. Air monitoring <br /> equipment required for petroleum contaminated sites will include the following: <br /> 18 <br />
The URL can be used to link to this page
Your browser does not support the video tag.