My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SR0078254 (3)
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
601
>
2900 - Site Mitigation Program
>
SR0078254 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2026 2:23:14 PM
Creation date
7/17/2026 2:09:22 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
SR0078254
PE
2903 - WORKPLAN/REPORT PLAN CHECK - OTHER AGENCY
FACILITY_ID
FA0024288
FACILITY_NAME
MAIN ST INVESTMENTS
STREET_NUMBER
601
Direction
E
STREET_NAME
MAIN
STREET_TYPE
ST
City
STOCKTON
Zip
95205
APN
14918006
CURRENT_STATUS
Active, billable
QC Status
Approved
Scanner
SJGOV\gmartinez
Supplemental fields
Site Address
601 E MAIN ST STOCKTON 95205
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Site Assessment Work Plan <br /> MAIN STREET INVESTORS (CITY OF STOCKTON) <br /> 601 East Main Street, Stockton, California <br /> 1.0. INTRODUCTION <br /> Advanced GeoEnviron mental, Inc. (AGE) has prepared this, Site Assessment Work Plan <br /> for the property located at 601 East Main Street, Stockton, California (site). The proposed <br /> scope of work includes the advancement of one (1) soil boring for the installation of a <br /> shallow groundwater monitoring well and two probe borings for the collection of grab <br /> groundwater samples. This work plan was prepared in accordance with directives in the <br /> Central Valley Regional Water Quality Control Board (CVRWQB) letter dated <br /> 06 November 2018 (Appendix A). <br /> A map depicting the location of the site is included in Figure 1. A site plan is presented in <br /> Figure 2, depicting the proposed well and boring locations. An aerial view of the site is <br /> included in Figure 3. The estimated lateral extents of the adsorbed and dissolved impact <br /> are illustrated in Figures 4 through 6. <br /> 2.0. SCOPE OF WORK <br /> Based on results from site assessment activities, AGE proposes to advance one pilot soil <br /> boring for installation of a shallow groundwater monitoring well and two probe borings for <br /> collection of grab groundwater samples to define the lateral and vertical extent of <br /> dissolved petroleum hydrocarbon impact and calculate groundwater flow direction and <br /> gradient at the site. As part of this investigation, AGE proposes to perform one soil-vapor <br /> sampling event utilizing site wells VP-1 and VP-2. <br /> The proposed scope of work includes the following tasks: <br /> • Permitting and pre-field work activities. <br /> • Pilot soil boring advancement and soil sample collection. <br /> • Monitoring well installation, development, and survey. <br /> • Groundwater sample collection. <br /> • Soil probe boring advancement for collection of soil and grab groundwater <br /> samples. <br /> • Performance of one additional round of soil-vapor sampling utilizing wells VP-1 <br /> and VP-2. <br /> • Report preparation. <br /> Each of these tasks is described in greater detail below. <br />
The URL can be used to link to this page
Your browser does not support the video tag.