My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU-2601438_SSNL
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
Z
>
ZUCKERMAN
>
4103
>
2600 - Land Use Program
>
SU-2601438_SSNL
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/5/2026 8:55:09 AM
Creation date
8/5/2026 8:33:46 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
FileName_PostFix
SSNL
RECORD_ID
SU-2601438
PE
2602 - SOIL SUITABILITY AND NITRATE LOADING STUDY REVIEW
STREET_NUMBER
4103
Direction
N
STREET_NAME
ZUCKERMAN
STREET_TYPE
RD
City
STOCKTON
Zip
95206
APN
12908054
CURRENT_STATUS
In Review
QC Status
Approved
Scanner
SJGOV\gmartinez
Supplemental fields
Site Address
4103 N ZUCKERMAN RD STOCKTON 95206
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
168
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1.GENERAL INSTALLATION POLICY INFORMATION <br /> The policy contained herein describes specific policy information and purchaser requirements for underground <br /> wastewater precast concrete tanks and structures (hereon referred as TANK, including grease interceptors, sand-oil <br /> interceptors, sand traps, stormwater interceptors, septic tanks, clarifiers and holding tanks. Other Jensen Precast <br /> company policies, including shipping, terms and conditions, ordering instructions, and others also apply. Contact <br /> Jensen Precast for complete information. <br /> In general, Jensen Precast provides delivery and setting of the TANK and sealing of the TANK in accordance with <br /> the provisions of this policy.In a situation where our truck cranes cannot set the TANK for whatever reason,we will <br /> provide a representative to supervise in the proper setting of the TANK and then seal the primary components as <br /> specified herein. <br /> Jensen Precast accepts responsibility for proper setting, assembly, and sealing of the TANK when installed or <br /> supervised by Jensen Precast or an authorized representative. A TANK handled,moved, or installed without Jensen <br /> Precast supervision,could nullify Jensen Precast's responsibility of warranty. <br /> NOTE:Failure to follow proper TANK installation and or sealing procedures may result in structural damage <br /> to the system or compromise its functional design along with nullifying product warranties. <br /> 2.EXCAVATION AND SITE PREPARATION <br /> The TANK must be set on a properly prepared base to ensure against movement of either the TANK or the inlet and <br /> outlet lines.The excavation shall be the proper width and length to accept the model selected and shall have enough <br /> extra width and length to allow for safe installation and sealing of the components. Suitable native soil or sub-base <br /> shall be prepared to handle anticipated loads.The excavation shall be bedded with suitable granular material and <br /> shall be compacted to 90%of its maximum dry density in accordance with ASTM D 1557 or to the requirements of <br /> the project geotechnical engineer.The bottom of the excavation shall be graded level. <br /> The area around the tank must be cleared to a minimum of 2' around the tank and 3' around any joint to be sealed. <br /> The excavation's slope,benching or shoring shall comply with the requirements of OSHA 29 CFR 1926 Subpart P. <br /> Jensen Precast will not violate this OSHA standard in the course of setting and sealing the TANK. <br /> On battery TANK systems(multiple tanks joined together)with capacities in excess of 5,000 gallons,redwood grade <br /> boards shall be used to ensure a level and stable tank joint.A minimum of two 2"x 6"grade boards,laid flat,running <br /> the full length of the entire TANK assembly directly under the outside walls shall be used. The top of the compacted <br /> fill material shall match the top of redwood grade boards prior to setting the TANK. A stringline or other suitable <br /> means for aligning tanks shall be provided and in place prior to installation. <br /> The owner,customer,contractor,or others shall be responsible for the following: <br /> l. Two workers or laborers to direct and assist the setting of,and location of the TANK. <br /> 2. Providing a properly prepared,sized,compacted base and graded excavation. <br /> 3. Supplying and installing redwood grade boards under battery TANK. <br /> 4. Providing job site safety,excavating safety,shoring as required,water and or flotation control. <br /> 5. Completing the entire installation and all other site work not specified herein. <br /> 3.SETTING AND INSTALLATION <br /> Jensen Precast requires assistance from the customer or contractor in setting, sealing, and placing the TANK `a <br /> minimum of two workers is reauired). Access and setting location for our boom truck or other equipment must be <br /> acceptable to our driver or representative. Tanks 2000 gallons and larger require extreme caution due to the weight <br /> of the product. There may be situations where an outside crane may be needed to set the product. Contact Jensen <br /> Precast for details. <br /> Since site conditions,products,and delivery equipment vary tremendously,the logistics must be carefully considered <br /> to determine the best possible approach for delivery and setting,including but not limited to: <br /> MANUFACTURER OF PRECAST CONCRETE PRODUCTS 3 <br /> Tank InstalWon Procedures-rev 101624.docx <br />
The URL can be used to link to this page
Your browser does not support the video tag.