1. The capacity of the crane,whether it's a Jensen Precast truck crane or contractor's crane to be used. <br /> 2. The maximum product weight relative to the setting distance from the center of the crane to the center of <br /> the excavation which cannot exceed our truck crane's rated capacity and setback distance from the <br /> excavation. <br /> 3. The type of terrain, site slope,and ground conditions for outrigger footing. <br /> 4. The access route for boom truck or other equipment. <br /> 5. The overhead restrictions(power lines,trees etc.)and other physical constraints. <br /> ANY of the above could prevent Jensen Precast from setting the TANK. <br /> NOTE: If for any reason Jensen Precast cannot set the TANK,Jensen Precast will not be responsible or <br /> charged for setting by any other means. <br /> Check that the tank is level while connected to the crane. <br /> The owner,customer,contractor,or others shall be responsible for the following: <br /> 1. Finished grading,leveling,and positioning of TANK,and access openings. <br /> 2. Grouting, sealing, setting, and adjusting of grade rings, risers, frames, covers, and all other hardware and <br /> appurtenances. <br /> 3. Supplying and installing inlet and outlet pipes. <br /> 4. Sealing above the top of the TANK. <br /> 5. Any and all permits, licenses, tests, or approvals from any administrative authority that are required for <br /> installation of the TANK. <br /> The installation of the inlet and outlet pipes must comply with but are not limited to the following requirements: <br /> l. Any 4"plumbing tee must not exceed 10"of distance from the inside wall. <br /> 2. Any 6"plumbing tee must not exceed 13.5"of distance from the inside wall. <br /> 3. Jensen standard tank plumbing components are PVC,and therefore must be properly bonded to inbound and <br /> outbound PVC with PVC primer and cement.If the inbound and outbound pipes are ABS,the plumbing must <br /> be properly bonded using a transition cement or mechanical coupling. <br /> 4. Follow all manufacturer specifications associated with any products used to install the plumbing components. <br /> 4.VENTILATION <br /> The TANK is equipped with inlet&outlet tee's which allow gases to escape the TANK atmosphere into the building <br /> plumbing/ventilation system as prescribed by the Uniform Plumbing Code(UPC)unless local regulations supersede. <br /> Failure to provide proper ventilation for the TANK could result in an odor problem. Please consult the Uniform <br /> Plumbing Code and/or local regulations for additional information. If additional venting requirements are required, <br /> contact Jensen Precast. <br /> 5.TANK SEALING(BATTERY TANKS AND TANKS WITH HORIZONAL SEAMS) <br /> For installation of sectional TANKs requiring job site joint sealing, Jensen Precast will seal the TANK only. The <br /> owner, customer, or contractor shall be responsible for sealing or grouting of grade rings, risers, covers, inlets, and <br /> outlets if required. The TANK must be dry for the sealant to bond properly to the concrete. The sealant must <br /> completely cure according to the timetable below before conduction a water-tight testing. <br /> Type of Water Test Ambient Temperature Cure Time hours <br /> To Operation Level Greater Than 70'F 24 <br /> Less Than 70'F 48 <br /> To Top of Tank All 72 <br /> Failure to follow these guidelines or not allowing for a full cure of the joint sealant could cause the TANK to fail <br /> water testing and possibly void Jensen Precast responsibility and product warranty. <br /> MANUFACTURER OF PRECAST CONCRETE PRODUCTS 4 <br /> Tank Installation Procedures-rev 101624.docx <br />