My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU-2601438_SSNL
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
Z
>
ZUCKERMAN
>
4103
>
2600 - Land Use Program
>
SU-2601438_SSNL
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/5/2026 8:55:09 AM
Creation date
8/5/2026 8:33:46 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
FileName_PostFix
SSNL
RECORD_ID
SU-2601438
PE
2602 - SOIL SUITABILITY AND NITRATE LOADING STUDY REVIEW
STREET_NUMBER
4103
Direction
N
STREET_NAME
ZUCKERMAN
STREET_TYPE
RD
City
STOCKTON
Zip
95206
APN
12908054
CURRENT_STATUS
In Review
QC Status
Approved
Scanner
SJGOV\gmartinez
Supplemental fields
Site Address
4103 N ZUCKERMAN RD STOCKTON 95206
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
168
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
If the Administrative Authority requires visual inspection of the exterior walls during the water test, then use the <br /> following procedures. <br /> SINGLE TANK UNITS: Backfilling in increments can accomplish an exterior wall inspection when done in 2-foot <br /> lifts.To begin introducing,2 feet of water in the bottom of the TANK.Once inspected,backfill and compact 2 feet of <br /> the outside walls, after compaction add an additional 2 feet of water into the tank. Inspect the outside walls as <br /> previously done and repeat these procedures until completely inspected and backfilled. <br /> MULTIPLE TANKS IN A BATTERY CONFIGURATION: Backfilling,in increments can accomplish an exterior <br /> wall inspection when done in 2-foot lifts.However,prior to the introduction of water to the tanks,all outside walls <br /> should be backfilled and compacted to a minimum of 2 feet. Subsequently,2 feet of water can be introduced to the <br /> TANK and the same procedure followed as above. <br /> Bypassing or isnorinL,any of these requirements (to any degree) could cause damaze to the TANK and void <br /> the Jensen Precast warranty. <br /> For additional information or clarification please contact Jensen Precast <br /> 11.VACCUM TESTING <br /> This test method is intended to be used to demonstrate the condition of the installed system prior to backfill. <br /> WARNING: Testing of the system before backfilling is necessary to preclude inadvertent structural overloading of <br /> the system components during the test.Follow procedures set forth in ASTM 1613 and C 1227. <br /> Seal the tank and apply a vacuum of 4"of mercury.Hold the vacuum for 5 minutes.During the initial 5 minutes,the <br /> vacuum shall not drop more than%"of mercury,which allows for equipment pressure equalization loss.If the <br /> vacuum drops,it shall be brought back up to 4"of mercury and held for additional 5 minutes with no vacuum loss.It <br /> the tank fails the test;it shall be repaired and retested. <br /> 12.REPAIR <br /> 13.PRECAUTIONARY NOTE <br /> Underground TANKS, and other similar type enclosures are confined spaces and entry is not recommended as the <br /> atmosphere may be hazardous. If entry is necessary, enter only with the proper equipment and follow O.S.H.A. <br /> confined space entry procedures. <br /> Jensen Precast recommends that all applicable O.S.H.A.recommendations are read and followed,including the current <br /> section on confined spaces and"Permit Required Confined Space". <br /> This warning is presented for precautionary safety advice only. Owners, users, installers, contractors, etc. are <br /> responsible for job site safety and O.S.H.A.compliance. <br /> 14.ACCEPTANCE <br /> Jensen Precast's responsibility for the TANK installation and sealing shall be considered finished and the tank shall <br /> be considered accepted by the owner once any of the following occurs: <br /> 1. The owner,contractor,customer,or engineer accepts the system. <br /> 2. A watertightness test has been completed and satisfactorily passed. <br /> 3. The TANK has been placed in service. <br /> 4. The safety conditions on the job site are not acceptable to Jensen Precast or its authorized representative. <br /> 5. Failure or gross neglect in following the instructions contained herein. <br /> MANUFACTURER OF PRECAST CONCRETE PRODUCTS g <br /> Tank Installation Procedures-rev 101624.docx <br />
The URL can be used to link to this page
Your browser does not support the video tag.