My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU-2601438_SSNL
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
Z
>
ZUCKERMAN
>
4103
>
2600 - Land Use Program
>
SU-2601438_SSNL
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/5/2026 8:55:09 AM
Creation date
8/5/2026 8:33:46 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
FileName_PostFix
SSNL
RECORD_ID
SU-2601438
PE
2602 - SOIL SUITABILITY AND NITRATE LOADING STUDY REVIEW
STREET_NUMBER
4103
Direction
N
STREET_NAME
ZUCKERMAN
STREET_TYPE
RD
City
STOCKTON
Zip
95206
APN
12908054
CURRENT_STATUS
In Review
QC Status
Approved
Scanner
SJGOV\gmartinez
Supplemental fields
Site Address
4103 N ZUCKERMAN RD STOCKTON 95206
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
168
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
6.BACKFILLING <br /> Failure to comply with proper backfill procedures could result in structural damage or leakage from pipe connections, <br /> or leakage from the TANK,due to settling,point loading,impacting,etc.Backfill shall be suitable clean material and <br /> shall be laid in lifts limited to 24" and adequately compacted from bottom to top to prevent movement or settling <br /> under the pipe or fittings. Only mechanical backfilling methods can be utilized; water jetting (liquification of <br /> backfill dirt)is not acceptable and could damage the TANK. <br /> CAUTION: High slump or flowable backfill like cement slurries must not be laid in lifts greater than 24"and <br /> must be allowed to set up before the next lift is laid. It is recommended that before using flowable backfills, <br /> contact Jensen Precast to discuss procedures for your application. <br /> 7.WATERTIGHT TESTING OVERVIEW <br /> When watertight testing is required during inspection,testing must be completed and approved after installation,but <br /> before the tank is put into service.Testing for water tightness shall be performed using either hydrostatic water test or <br /> vacuum test per ASTM C 1227-09 section 9 or ASTM C 1613 section 9. Standard water test is conducted up to the <br /> outlet of the tank per ASTM. <br /> Warning:Water tests conducted above the lid of the tank may have structural implications and could exceed <br /> the structural design of the tank. Contact Jensen Precast for complete details. <br /> TANK with capacities of 2000 gallons or greater have specific backfill requirements before water testing. See <br /> section 10. <br /> The owner,customer,contractor,or others shall be solely responsible for the following: <br /> 1. Conducting and approval of the test. <br /> 2. Providing water and means to pump or evacuate water for testing or any subsequent retesting. <br /> 3. Providing the vacuum pump,seals for access opening and pipe plugs. <br /> 4. Sealing or testing grade rings,risers,covers,other openings,etc. <br /> 5. Any required sealing and testing of inlet and outlet pipelines. <br /> 8.PRE-TEST INSPECTION <br /> Before any applicable tests are performed and before the TANK is placed into service,a visual inspection is to be <br /> performed to ensure that the TANK is free of trash and debris that could prevent the TANK from functioning <br /> properly. All foreign objects such as rocks,trash,tools,or construction materials left inside the TANK from the <br /> installation process should be removed and properly disposed. Check that the tank is level. <br /> Check that the inlet and outlet pipe are properly connected and sealed to the tank. Check the tank inlet, baffle and <br /> outlet have the appropriate pipe fitting attached and have no obstructions. <br /> 9.WATER TESTING TANKS UP TO 1500 GALLONS <br /> The TANK shall be filled to the operational liquid level (outlet invert) with water and allowed to stand to achieve <br /> complete concrete absorption, then refilled to the same level. Once refilled, there shall be no measurable liquid loss <br /> in the following hour. (Ref.ASTM C-1227-07 9.2.2) <br /> 10.WATER TESTING TANKS 2000 GALLONS AND GREATER <br /> All TANKS of 2000 gallon capacity or greater and all battery TANKS must be backfilled to the outlet pipe when <br /> water testing.Warning:Water testing tanks with a liquid capacity of 2000 gallons or greater without backfilling <br /> could damage the tank.The TANK shall be filled to the operational liquid level with water and allowed to stand to <br /> achieve complete concrete absorption,then refilled to the same level.Once refilled,there shall be no measurable liquid <br /> loss in the following hour. (Ref.ASTM C-1227-07 9.2.2) <br /> MANUFACTURER OF PRECAST CONCRETE PRODUCTS 5 <br /> Tank Installabon Procedures-rev 101624.doex <br />
The URL can be used to link to this page
Your browser does not support the video tag.