My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU-2601438_SSNL
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
Z
>
ZUCKERMAN
>
4103
>
2600 - Land Use Program
>
SU-2601438_SSNL
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/5/2026 8:55:09 AM
Creation date
8/5/2026 8:33:46 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
FileName_PostFix
SSNL
RECORD_ID
SU-2601438
PE
2602 - SOIL SUITABILITY AND NITRATE LOADING STUDY REVIEW
STREET_NUMBER
4103
Direction
N
STREET_NAME
ZUCKERMAN
STREET_TYPE
RD
City
STOCKTON
Zip
95206
APN
12908054
CURRENT_STATUS
In Review
QC Status
Approved
Scanner
SJGOV\gmartinez
Supplemental fields
Site Address
4103 N ZUCKERMAN RD STOCKTON 95206
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
168
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
NOTES - PAGE 1 <br /> 1. SANITATION SYSTEM CONTRACTOR IS TO REVIEW THE SJC EHD S.S.N.L.REPORT FOR THIS PROJECT FOR ADDITIONAL INFORMATION/SPECIFICATIONS,- <br /> 2. OWNER'S SURVEY TEAM WILL PLOT ALL ON-SITE IMPROVEMENTS FOR PROPER FIXED WORKS INSTALLATIONS. <br /> 3. THERE IS TO BE A PRE-CON MEETING BEFORE COMMENCEMENT OF EACH PORTION OF THE CAMP GOLD STAR O.W.T.S.PROJECT: <br /> 1.)HERO LODGES SEPTIC TANK LOCATIONS AND INSTALLATION,INFLUENT PIPING CONNECTIONS/GRADIENTS/CLEAN-OUTS. <br /> 2.)GRAVITY FLOW PIPING TO EACH LIFT STATION LOCATION. <br /> 3.)LIFT STATION TANKS AND DUPLEX PUMP SYSTEMS WITH CONNECTIONS OF FINAL EFFLUENT DISCHARGE TO FLOW EQUALIZATION TANK. <br /> 4.)PACKAGE TREATMENT PLANT(PTP)INSTALLATION. <br /> 5.) FILTER BED CONSTRUCTION. <br /> 4. SEVEN DIFFERENT LODGE STYLES ARE PROPOSED. ENSURE EACH FUTURE CONCRETE BUILDING PAD HAS THE PROPER LODGE SPECIFIED. <br /> S. DETERMINE APPROXIMATE LOCATION OF LODGE WASTE OUTLET PIPE BASED ON FLOOR PLANS FOR EACH LODGE. <br /> 6. EACH SEPTIC TANK LOCATION DETERMINED BY INDIVIDUAL PARAMETERS PERTAINING TO THAT SPECIFIC LODGE,E.G.,EXTERNAL LODGE APPURTENANCES SUCH AS DECKS,STAIRCASES,ETC. <br /> 7. INSTALL P&L CONCRETE,INC.,1.5K GALLON,2 COMP.MONOLITHIC/TRAFFIC-RATED SEPTIC TANK IN THE DETERMINED LOCATIONS FOR EACH LODGE:; FRONT SOLIDS COMPARTMENTS ARE TO BE <br /> OUTSIDE OF BUILDING PAD FOOTPRINT FOR ACCESSIBILITY BY PUMPER TRUCK. THE SECOND COMPARTMENTS OF EACH SEPTIC TANK ARE TO BE UNDER FUTURE CONCRETE PAD. <br /> 8. INSTALL POLYLOK'M RISER SAFETY SCREENS ON THE TOP RISER OF THE RISER STACK ON ALL SEPTIC TANKS. <br /> 9. CONNECT 3"SCH 40 PVC INFLUENT LINE FROM SEPTIC TANK BACK TOWARDS FUTURE LODGE WASTE OUTLET AT 2%RISE. INSTALL TWO-WAY C.O.,AS ILLUSTRATED. N=54 <br /> 10.CAP 3"INFLUENT LINE ADJACENT TO LODGE WASTE OUTLET UNTIL CONCRETE SLAB IS POURED. CAVCO RESPONSIBLE FOR CONNECTING WASTE OUTLET FROM LODGE. <br /> 11.CONNECT TO 3"INFLUENT LINE FROM WASTE OUTLET AT 2%GRADE TO SEPTIC TANK AFTER LODGES ARE MOVED ONSITE. SUPPORT INFLUENT PIPING PER CAVCO STANDARDS. <br /> 12.EXTEND SECOND COMPARTMENT TANK RISERS HIGH ENOUGH TO ALLOW CONCRETE POUR. TANK LID TO MATCH FUTURE FINISHED ELEVATION OF CONCRETE PAD. <br /> 13.AFTER SEPTIC TANK INSTALLATION,INSTALL 3"DIA.SCH.40 PVC OUTLET TIGHTLINES AT 1%GRADE,EXTEND OUTSIDE OF CONCRETE PAD FOOTPRINT AND CAP FOR FUTURE CONNECTIONS. <br /> 14.INSTALL SEPTIC TANK MONITORING SYSTEMS(STMS)ON THE EIGHT TANKS LISTED ON PAGE 10 OF EHD REPORT AND AS ILLUSTRATED ON AUXILIARY PLANS. <br /> 15.FOR THE LIQUID SIDE OF EACH STMS TANK THAT WILL BE UNDER A CONCRETE SLAB,EXTEND 4"OBSERVATION TUBE ABOVE PAD ELEVATION. WRAP,4"PIPE WITH FOAM WRAP,OR EQUIVALENT. <br /> 16.INSTALL JENSEN 1.5K GALLON SEPTIC TANK MODEL 1500-EE-ST FOR RESTROOMS AND GUEST LAUNDRY/HOUSEKEEPING BUILDINGS AFTER INVERT ELEVATIONS ARE ESTABLISHED. <br /> 17.INSTALL FILTROLTM 160 WASHING MACHINE LINT TRAP FILTERS AFTER INSTALLATION OF WASHING MACHINES. <br /> 18.APPROXIMATE TOTAL LENGTH OF 3"PIPE=2,660' <br /> 19.CONNECT 3"DIA.SCH.40 PVC SEPTIC TANK EFFLUENT TIGHTLINES AT 1%GRADE TO GRAVITY FLOW TO TRUNK LINES,THEN TO THE FOUR LIFT STATIONS,AS ILLUSTRATED. G 75479 <br /> 20.INSTALL 3"PVC DOUBLE%BEND AT LIFT STATION#1(AFTER STMS INSTALLATION)AND AT LIFT STATION#2 TO ACCEPT GRAVITY INFLOW FROM TWO IDIRECTIONS. �T <br /> �T 001 4Q <br /> Or CA��F <br />
The URL can be used to link to this page
Your browser does not support the video tag.