NOTES - PAGE 2 <br /> 21.INSTALL 1.5K GALLON JENSEN LIFT STATION TANKS#1,#2,#3,AND#4 WITH CONNECTIONS FROM THE RESPECTIVE LODGES/BUILDINGS,AS ILLUSTRATED. <br /> 22. INSTALL DUPLEX LIFT STATION CHAMPION PUMPS,INC.,MODEL CPSTEPF512(A)IN SECOND COMPARTMENT IN EACH OF THE 4 LIFT STATIONS. ENSURE CHECK VALVES ON EACH PUMP. (N=8). <br /> 23.SET FLOATS TO PUMP 125 GALLONS PER CYCLE. <br /> 24.INSTALL ALDERONTm FLEX POWER PAK FLXP1D230,SINGLE PHASE,DUPLEX CONTROL PANEL AND HAVE DUPLEX PUMPS ALTERNATE ON ALL 4 LIFT STATIONS. <br /> 25.CONTROL PANEL PEDESTALS TO BE INSTALLED IN OPTIMUM LOCATIONS ADJACENT TO EACH INDIVIDUAL LIFT STATION TANK. <br /> 26.INSTALL JENSEN INFRASTRUCTURE 10K GALLON SETTLING/FLOW EQUALIZATION TANK P/N 200070328 IN LOCATION AS DETERMINED BY SURVEY CREW,AND AS ILLUSTRATED ON PTP SCHEMATIC. <br /> 27.INSTALL ANUA PLEATED GRAVITY EFFLUENT FILTER IN 10K GALLON TANK PER ANUA SPECIFICATIONS. <br /> 28.CONNECT 2"DISCHARGE LINES FROM DUPLEX PUMPS TO 2"X 2"X 2"HUB WYE TO FORM SINGLE TRANSPORT LINE <br /> 29.INSTALL THRUST BLOCKS AS NOTED. DESIGN TO BE DETERMINED IN THE FIELD BASED ON ENCOUNTERED SOIL CHARACTERISTICS AND TRENCH EXCAVATION WIDTHS AT BENDS. <br /> 30.CONNECT 2"TRANSPORT LINES TO A 4"X 4"X 2"X 2"REDUCING DOUBLE WYE ON NORTH SIDE(LIFT STATIONS#1 AND#2)AND EAST END(LIFT STATIONS#3 AND#4)OF 10K GAL.FLOW <br /> EQUALIZATION TANK. APPROXIMATE TOTAL LENGTH OF 2"PIPE=662' <br /> 31.ATTACH 90 DEGREE LONG SWEEP ELBOW AT END OF 4"LINE INSIDE OF 10K GAL.EQUALIZATION TANK TO DEFLECT INCOMING EFFLUENT DOWNWAI D. <br /> 32.INSTALL 3.OK GALLON JENSEN INFRASTRUCTURE MARINA HOLDING TANK P/N 200033767 IN LOCATION ILLUSTRATED AND SPECIFIED BY SURVEY CREW. <br /> 33.INSTALLATION OF MARINA HOLDING TANK REQUIRES COORDINATION WITH MID-CAL CONSTRUCTION CO. MID-CAL RESPONSIBLE FOR PUMP AND TRANSPORT PIPING TO HOLDING TANK. <br /> 34.INSTALL SJE RHOMBUSTM C-LEVEL CL100 SENSOR P/N 1087303,WITH 50'VENTED CABLE. NEMA 1 RATED FOR INDOOR USE. OWNER PREFERENCE TO INSTALL IN RESTROOM UTILITIES CLOSET. <br /> 35.INSTALL PURAMAXTM MBBR TANK IN LOCATION AS DETERMINED BY SURVEY CREW AND ILLUSTRATED ON PACKAGE TREATMENT PLANT SCHEMATIC,WITH ANUA SPECIFIED CONNECTIONS FROM <br /> 10K GALLON FLOW EQUALIZATION TANK. <br /> 36.INSTALL PURAMAX PIPING AND AIRACARBTM ODOR CONTROL SYSTEM PER ANUA INSTALLATION PROCEDURES. <br /> 37. INSTALL SIMTECH NOVA-(NO-VAULT)PUMP FILTER P/N STF-NV06-24-UNI W/2"PUMP DISCHARGE SIZE FOR DUPLEX PUMP SYSTEM. <br /> 38.INSTALL ZOELLERTM MODEL 5034-0008(75 GPM/15.3 TDH)DUPLEX PUMP SYSTEM IN DUPLEX NOVA PUMP FILTERS W/CHECK VALVES. <br /> 39.INSTALL DISCHARGE PUMPS IN FINAL CHAMBER OF PURAMAX UNIT. SET FLOATS AT 300 GALLONS PER DOSE TO FILTER BED. <br /> 40.CONNECT 2"SCH 40 PVC TRANSPORT LINES FROM PUMPS WITH 2"X 2"X 2"HUB WYE TO MATCH WITH CENTER FEED MANIFOLD,AS ILLUSTRATED. <br /> 41.INSTALL INFILTRATORT'EZFLOW MODULES P/N 1801P-GEO,AS ILLUSTRATED. 3"INTERNAL PERFORATED PIPE,N=40. BLANK MODULES W/NO INTERNAL PERFORATED PIPE,N=29 . <br /> �RpF t <br /> 42.INSTALL 2 FILTER BED OBSERVATION/MONITORING TUBES,PER AUXILIARY AND FILTER BED PLAN VIEW. a $ y <br /> �A <br /> 43.CONNECT SCH 40 PVC 1.5"DIA.LATERALS TO 2"MANIFOLD WITH REDUCING CROSSES,PER FILTER BED PLANS. a C 75479 <br /> 44.W/NEW DRILL BIT,DRILL 1/8"ORIFICES AT 12 O'CLOCK EVERY 3 FT FROM MANIFOLD. INSTALL TERMINAL SWEEP CLEAN-OUTS AT LATERAL AND MANIFOLD ENDS. <br /> 0r c��>�° <br /> 45.AFTER DISCHARGE PUMPS/LATERALS INSTALLATION AND TANKS CHARGED,CALL EHD 209-953-7697 FOR 5'RESIDUAL HEAD VERIFICATION. r� <br />