My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU-2601438_SSNL
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
Z
>
ZUCKERMAN
>
4103
>
2600 - Land Use Program
>
SU-2601438_SSNL
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/5/2026 8:55:09 AM
Creation date
8/5/2026 8:33:46 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
FileName_PostFix
SSNL
RECORD_ID
SU-2601438
PE
2602 - SOIL SUITABILITY AND NITRATE LOADING STUDY REVIEW
STREET_NUMBER
4103
Direction
N
STREET_NAME
ZUCKERMAN
STREET_TYPE
RD
City
STOCKTON
Zip
95206
APN
12908054
CURRENT_STATUS
In Review
QC Status
Approved
Scanner
SJGOV\gmartinez
Supplemental fields
Site Address
4103 N ZUCKERMAN RD STOCKTON 95206
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
168
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
AiraCarbTM Odor Control System <br /> Specification XXXXXX <br /> PART1 GENERAL <br /> 1.1 DEFINITIONS <br /> A. Owner: <br /> B. Engineer: <br /> C. Contractor: The firm that enters into a contract with the Owner to furnish <br /> materials and services at a specified price. <br /> D. Manufacturer: The firm that is responsible for the design and supply of all <br /> equipment and services in their scope of supply UNO. <br /> E. Person-Day: One person for 8 hours within regular Contractor working <br /> hours. <br /> F. H2S: Hydrogen Sulfide Gas <br /> G. TRS —A grouping of reduced sulfur compounds typically found in <br /> municipal wastewater odor control applications. <br /> 1.2 WORK OF THIS SECTION <br /> A. This document covers the furnishing and delivery for an activated carbon <br /> odor control system. <br /> B. The Contractor shall purchase and install the odor control system. <br /> Installation components and scope of work required for installation of the <br /> system shall be provided by the Contractor as outlined in Part 2 of this <br /> proposal. <br /> 1 of 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.