Laserfiche WebLink
RECLAMATION DISTRICT NO. 2030 <br /> DELTA FARMS <br /> 3425 Brookside Road Suite A <br /> Stockton, CA 95219 <br /> Telephone: (209)956-9940 <br /> TRUSTEES SECRETARY AND COUNSEL <br /> Dennis Gardemeyer,President The Hartmann Law Firm <br /> Jim Paroli ENGINEER <br /> Brian Zeller Kjeldsen,Sinnock&Neudeck,Inc. <br /> August 26, 2025 <br /> alisa.goulart@sj gov.org <br /> Alisa Goulart,Planner <br /> San Joaquin County <br /> Community Development Department <br /> 1810 East Hazelton Avenue <br /> Stockton, CA 95205 <br /> Re: CEQA Review Comments-Conditional Use Permit No. PA-2400377 <br /> Camp Gold Star Resort-Initial Study/Mitigated Negative Declaration(IS/MND) <br /> Dear Ms. Goulart, <br /> As District Engineer and District Counsel for Reclamation District 2030-Delta Farms (RD <br /> 2030), we have reviewed the Conditional Use Permit application,the Initial Study/Mitigated <br /> Negative Declaration(IS/MND) and supporting documents for the proposed Camp Gold Star <br /> Resort project located on McDonald Island, approximately 3.3 miles north of Zuckerman Bridge, <br /> Stockton,CA(APN 129-080-54). The Reclamation District(District)is charged with <br /> maintaining the levee system and drainage system that protects the Island from flooding. Based <br /> on our review of the IS/MND and related documents, we submit herewith Reclamation District <br /> No. 2030' comments and conditions for the proposed project. <br /> 1. Reimbursement Agreement—Applicant shall enter into a Reimbursement Agreement <br /> with Reclamation District No.2030 to cover the District's costs associated with the <br /> review plans and project documents,and for the preparation and processing of permits <br /> and agreements. <br /> 2. Entry Permit- Applicant shall enter into an Entry Permit with Reclamation District No. <br /> 2030 for contractor, staff, visitors and vendor access across the McDonald Island bridge <br /> and along the levee patrol road,to the site. <br /> 3. In-Lieu Assessment Agreement-Applicant shall enter into an In-Lieu Assessment <br /> Agreement with Reclamation District No. 2030 to reimburse the District for the project's <br /> proportional benefit of the District's annual levee maintenance,bridge maintenance and <br /> drainage maintenance costs. <br />