My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_PRE 2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
I
>
INDUSTRIAL
>
1010
>
1900 - Hazardous Materials Program
>
PR0520328
>
COMPLIANCE INFO_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/8/2020 3:55:10 PM
Creation date
6/10/2018 11:28:10 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
1900 - Hazardous Materials Program
File Section
COMPLIANCE INFO
FileName_PostFix
PRE 2019
RECORD_ID
PR0520328
PE
1921
FACILITY_ID
FA0010456
FACILITY_NAME
THATCHER COMPANY OF CALIFORNIA INC
STREET_NUMBER
1010
STREET_NAME
INDUSTRIAL
STREET_TYPE
DR
City
STOCKTON
Zip
95206
APN
17728053
CURRENT_STATUS
01
SITE_LOCATION
1010 INDUSTRIAL DR
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
KBlackwell
Supplemental fields
FilePath
\MIGRATIONS\I\INDUSTRIAL\1010\PR0520328\COMPLIANCE INFO .PDF
QuestysFileName
COMPLIANCE INFO
QuestysRecordDate
11/2/2017 9:57:47 PM
QuestysRecordID
3716051
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
433
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Complaint (Code Reference VI -G vs. VI -E): <br />13.p. Violation of CFC, Appendix VI -G, Reference Table from the UBC — Required <br />Separation in Buildings of Mixed Occupancy (Hours), failure to maintain as separate the <br />repair shop and chlorine storage and transferring process; there must be a 2 -hour <br />occupancy separation between the chlorine transferring room (H-2 occupancy) and shop <br />area (B occupancy) <br />Fire Safety Inspection, July 18, 2002: <br />Inside Storage Area — North 7: The repair shop shall not be in the same room as the <br />chlorine storage and transferring process. There must be a 2 -hour occupancy separation <br />between the chlorine transferring room (H-2 occupancy) and shop area (B occupancy). <br />CFC, Table 313, Appendix VI -E <br />Sierra Chemical Response and Action: <br />Letter from Lonnie Kellar to Kent Miller, October 24, 2002, Chlorine Repackaging <br />Room (filling of 150# and 1 ton containers): All maintenance activities in this area, <br />unrelated to the repackaging process, have ceased. In the mean time, we are in the <br />permitting process for erection/construction of a new maintenance building located along <br />the east fence line to accommodate the maintenance activities. Permit 03 — 4076 Issued <br />on June 21, 2004 (Plans submitted May 28, 2003 (May 15, 2003)). Pending Permit Re - <br />Issuance for Building Height Change. <br />Cost: Parts Storage Pad $3,055.00; Shop Building $24,000.00; Concrete — Original Pad <br />$6,972.00, Concrete — Second Layer $9,952.00; Triple E Engineering $600.00; CBC <br />Steel $500.00; Permit $484.28; SUSD $85.00; Bain Steel $740.00 (Parts); Bain Steel <br />$450.00 (Coordination); Bain Steel $3,638.79 (Wall Panels); Bain Steel $4,660.00 <br />(Labor), CFR Services $220.00 (2005); Siegfried Engineering $3,045.00 <br />Complaint: <br />13.q. Violation of CFC, Article 80, sections 8004.2.2, failure to dispense and use hazardous <br />materials in open containers or systems in accordance with the CFC. Additionally, <br />pursuant to section 8001.4.2, containers, cylinders and tanks shall be designed and <br />constructed in accordance with nationally recognized standards <br />Fire Safety Inspection, July 18, 2002: <br />Sampling Station 1: Provide approved storage of hazardous liquid waste under the sink. <br />The open bucket capturing the waste liquids of reagent chemicals dumped down the open <br />sink does not comply with the code as an approved container. The liquid waste chemicals <br />shall have secondary containment. CFC 8004.2.2 and 8001.4.2 <br />Sierra Chemical Response and Action: <br />Sink was replaced with stand alone sink plumbed to closed sample basin on adjacent <br />Powell Machine <br />Cost: NA <br />
The URL can be used to link to this page
Your browser does not support the video tag.