Laserfiche WebLink
4. Describe procedures for notifying onsite emergency response personnel and outside <br />agencies (e.g., Fire, Health, Police, State OES) needed during hazardous materials <br />emergencies. <br />This is an unmanned facility <br />5. Describe any security system or equipment that could impede site access by <br />emergency responders. <br />The facility is secured with a chain-link fence that is closed and locked during non -business <br />hours. In addition, all doors are kept locked and the alarm is activated after hours. <br />OR: Possible fence and locks in place for access. <br />6. Describe procedures for notification and evacuation of visitors and employees during <br />hazardous materials emergencies. Primary and alternate evacuation routes and <br />assembly areas must be clearly identified on the site map. <br />This is an unmanned facility. In the event*personnel are present, verbal notification <br />will be made. Evacuate away from the facility to the street. <br />Describe mitigation or clean-up procedures to be implemented by onsite personnel in <br />the event of a release, threatened release, fire or explosion involving hazardous <br />materials. Indicate if the business has an onsite emergency response team (ERT) and <br />if so, describe how the ERT will interact with outside emergency response agencies <br />if additional assistance is required. <br />The person discoveringthe spill will: Keep others out of the area, attempt to stop the <br />flow of the leak, wear protective equipment and use spill kit to absorb the leak. If the <br />leak/release is beyond the persons capabilities, they will call 9-1-1 immediately <br />8. Describe procedures for immediate inspection, isolation, and shutdown of equipment <br />or systems that may be involved in a hazardous materials release or threatened <br />release. <br />Visual inspection of all affected areas or equipment will occur immediately. Any leaking <br />containers or equipment will be isolated and appropriate mitigation procedures will be <br />implemented. <br />