My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_PRE 2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
F
>
FREMONT
>
5000
>
2800 - Aboveground Petroleum Storage Program
>
PR0527046
>
COMPLIANCE INFO_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/29/2021 3:08:23 PM
Creation date
8/24/2018 6:22:17 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2800 - Aboveground Petroleum Storage Program
File Section
COMPLIANCE INFO
FileName_PostFix
PRE 2019
RECORD_ID
PR0527046
PE
2832
FACILITY_ID
FA0003907
FACILITY_NAME
PANELLA TRUCKING LLC
STREET_NUMBER
5000
Direction
E
STREET_NAME
FREMONT
STREET_TYPE
ST
City
STOCKTON
Zip
95215
APN
14330001
CURRENT_STATUS
01
SITE_LOCATION
5000 E FREMONT ST
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\kblackwell
Supplemental fields
FilePath
\MIGRATIONS\F\FREMONT\5000\PR0527046\COMPLIANCE INFO 2007 - 2013.PDF
QuestysFileName
COMPLIANCE INFO 2007 - 2013
QuestysRecordDate
9/7/2017 8:15:53 PM
QuestysRecordID
3628440
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
74
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SAN JOAQUIN COUNTY <br /> ENVIRONMENTAL HEALTH DEPARTMENT <br /> 600 East Main Street, Stockton, California 95202-3029 <br /> Telephone:(209) 468-3420 Fax: (209)468-3433 Web:www.sioov.org/ehd/unitiii.html <br /> CONTINUATION FORM Page: 4 of 4 <br /> OFFICIAL INSPECTION REPORT Date: 10/14/10 <br /> Facility Address: 5000 E. Fremont, Stockton Program: APSA <br /> SUMMARY OF VIOLATIONS <br /> CLASS 1 CLASS II or MINOR-Notice to Comply) <br /> 31. Failed to test spill prevention liquid sensing devices in the tanks annually and kept records. <br /> -- SPCC Plan Section 4.7 stated liquid sensing devices in tanks shall be tested annually. Conduct <br /> inspections and tests in accordance with written procedures that you or the certifying engineer develop <br /> for the facility. You must keep these written procedures and a record of the inspections and tests, signed <br /> by the appropriate supervisor or inspector, with the SPCC Plan for a period of three years. Records of <br /> inspections and tests kept under usual and customary business practices will suffice for purposes of this <br /> paragraph. <br /> Test the liquid sensing devices in the tanks in accordance to written procedures developed by you or <br /> the certifying engineer. Submit a copy of the signed report of the results and the written procedure by <br /> November 21 2010. Continue testing annually, and retain a copy of the appropriately signed report of <br /> the test with the SPCC Plan for minimum of three years available for inspection. <br /> 32. Failed to train personnel on spill prevention and conduct annual prevention briefings. <br /> -- At a minimum, train your oil-handling personnel in the operation and maintenance of equipment to <br /> prevent discharges; discharge procedure protocols; applicable pollution control laws, rules, and <br /> regulations; general facility operations, and, the contents of the facility SPCC Plan. Schedule and <br /> conduct discharge prevention briefings for your oil-handling personnel at least once a <br /> year to assure adequate understanding of the SPCC Plan for that facility. Such briefings must highlight <br /> and describe known discharges or failures, malfunctioning components, and any recently developed <br /> precautionary measures. <br /> " Conduct spill prevention training and submit evidence of the training to this office by November 21, <br /> 2C1C. Begin conducting annual briefing per this section. <br /> NOTES <br /> The inspection was conducted on October 14, 2010, but the final version of the inspection report was not <br /> completed until October 20, 2010. <br /> The EHD copy of the SPCC Plan is different than the final copy retained on site. Please submit the <br /> signed version of Page 3 and the completed Certification Checklist in Appendix A to this office. <br /> Complete and submit a copy of the Return to Compliance Certification form (provided with this report) <br /> with a statement of how each violation was corrected, including supporting documentation by November <br /> 21, 2010 <br /> ALL EHD STAFF TIME ASSOCIATED HATH FAILING TO COMPLY BY THE ABOVE NOTED DATES WILL BE BILLED AT THE CURRENT HOURLY RATE(f122). <br /> THIS FA ILITY IS SUBJECT TO REINSPECTION AT ANY TIME AT EHD'S CURRENT HOURLY RATE. <br /> EHD Insp or / Received By: Title: <br /> EHD }02 R 08/10/10 CONTINUATION FORM <br />
The URL can be used to link to this page
Your browser does not support the video tag.