Laserfiche WebLink
SWRCB, January 2002 <br />6. PIPING SUMP TESTING <br />Page 4 of 7 <br />Test Method Developed By: U Sump Manufacturer INIndustry Standard U Professional Engineer <br />U Other (Specify) <br />Test Method Used: ❑ Pressure ❑ Vacuum M Hydrostatic <br />❑ Other (Spec) <br />Test Equipment Used: Caldwell <br />Sump # 1 Sump # <br />Sump Diameter: 4211 <br />Equipment Resolution: <br />Sump # <br />Sump # <br />Sump Depth: <br />4011 <br />Sump Material: <br />Height from Tank Top to Top of <br />Highest Piping Penetration: <br />2411 <br />Height from Tank Top to Lowest <br />Electrical Penetration: <br />1211 <br />Condition of sump prior to testing: <br />Clean/Dry <br />Portion of Sump Tested' <br />2611 <br />Does turbine shut down when <br />sump sensor detects either product <br />or watery <br />X Yes I No U NA <br />U Yes U No t I NA <br />U Yes U No U NA <br />U Yes U No U NA <br />Turbine shutdown response time'* <br />3 Seconds <br />Is system programmed for fail-safe <br />shutdown?* <br />Xl Yes U No U NA <br />U Yes U No U NA <br />U Yes U No U NA <br />a Yes U No U NA <br />Was fail-safe verified to be <br />operational?* <br />XI Yes U No U NA <br />lJ Yes tJ No U NA <br />LI Yes L I No U NA <br />I 1 Yes U No U NA <br />Wait time between applying <br />pressure/vacuum/water and starting <br />test: <br />i hr. <br />2 <br />Test Start Time: <br />9.4 5 <br />Initial Reading (R,): <br />0 <br />Test End Time: <br />10 :15 <br />Final Reading (Rt): <br />0 <br />Test Duration: <br />r <br />Change in Reading (R)m-R,): <br />0 <br />Pass/Fail Threshold or Criteria: <br />0 Loss <br />Test Result: <br />LIKPass U Fail <br />U Pass U Fall <br />U Pass U Fail <br />U Pass U Fall <br />Was sensor removed for testing? <br />X Yes LI No U NA <br />U Yes U No U NA <br />U Yes U No U NA <br />U Yes U No U NA <br />Was sensor properly replaced and <br />verified functional after testing? <br />X Yes U No U NA <br />U Yes U No U NA <br />U Yes U No U NA <br />U Yes U No U NA <br />Comments — (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />' If the testing method does not test the entire depth of the sump, specify how much of the sump was tested. Methods not testing the <br />entire sump should only be used if the monitoring system provides fail-safe turbine shutdown. (See SWRCB LG -160) <br />2 With the submersible pump running, place the sensor in product (discriminating sensors should also be placed in water). The time <br />between placing the sensor in product and the turbine shutting down is the response time. This should be done if the secondary <br />containment testing method used does not test the entire volume of the sump. <br />This information is not needed if the entire sump is tested. <br />