Laserfiche WebLink
SWRCB, January 2002 <br />7. UNDER -DISPENSER CONTAINMENT (UDC) TESTING <br />Page 5 of 7 <br />Test Method Developed By: U UDC Manufacturer XJ Industry Standard U Professional Engineer <br />U Other (Specify) <br />Test Method Used: U Pressure U Vacuum KJ Hydrostatic <br />U Other (Specify) <br />st Equipment Used: Caldwell Equipment Resolution: <br />iUDC# at 1 UDC#Dis 1 &2 UDC# Sat2&3 UDC#Disp3&4 <br />UDC Manufacturer: <br />Environ <br />Environ Environ <br />Environ <br />UDC Material: <br />Plastic <br />Plastic Plastic <br />Plastic <br />UDC Depth: <br />" <br />24" 24" <br />24" <br />Height from UDC Bottom to Top <br />of Highest Piping Penetration: <br />8" <br />12" 10" <br />10" <br />Height from UDC Bottom to <br />Lowest Electrical Penetration: <br />Bottom <br />Bottom Bottom <br />Bottom <br />Condition of UDC prior to <br />testing: <br />Portion of UDC Tested' <br />loll- <br />1 4" 1211- <br />1211 - <br />2"Does <br />Does turbine shut down when <br />UDC sensor detects either <br />product or water'?* <br />LXYes U No U NA <br />4siYes U No U NA XLIYes U No U NA <br />INYes U No U NA <br />Turbine shutdown response timeseconds <br />3 seconds <br />3 seconds <br />Is system programmed for fail- <br />safe shutdown?* <br />LXYes U No U NA <br />l� Yes U No U NA t;KYes U No U NA <br />IXYes U No U NA <br />Was fail-safe verified to be <br />operational?* <br />LXYes U No U NA <br />D Wes UNo U NA IXYes U No U NA <br />XYes U No U NA <br />Wait time between applying <br />pressure/vacuum/water and <br />startingtest <br />i <br />a hr. <br />2 hr . z hr . <br />t <br />2 hr. . <br />Test Start Time: <br />9: 4 5 <br />9:45 9: 4 5 <br />9:45 <br />Initial Reading (R,): <br />Test End Time: <br />10:1 5 <br />1 0: 1 5 10:1L!,h <br />10 : 0 8 <br />Final Reading (Rl,): <br />-.0425 <br />Test Duration: <br />hr. <br />t— hr. <br />2 minutes <br />Change in Reading R., -R,): <br />.0425 <br />Pass/FaiI Threshold or Criteria: <br />1,27511per hr. <br />Test Result: <br />X Pass U Fall <br />LX Pass U Fall LXPass U Fail <br />U Pass XI Fall <br />Was sensor removed for testing? <br />LXYes LJ No U NA <br />X Yes U No U NA XU Yes U No U NA <br />IXYes U No U NA <br />Was sensor properly replaced and <br />verified functional after testing? <br />LKYes ❑ No ❑ NA <br />Rl Yes U No U NA XLJ Yes U No U NA <br />lXYes U No U NA <br />COMMentS — (include information on repairs made prior to testing, and recommended follow-up forfailed tests) <br />If the testing method does not test the entire depth of the UDC, specify how much of the UDC was tested. Methods not testing the <br />entire UDC should only be used if the monitoring system provides fail-safe turbine shutdown. (See SWRCB LG -160) <br />2 With the submersible pump running, place the sensor in product (discriminating sensors should also be placed in water). The time <br />between placing the sensor in product and the turbine shutting down is the response time. This should be done if the secondary <br />containment testing method used does not test the entire volume of the UDC <br />This information is not needed if the entire UDC is tested. <br />