Laserfiche WebLink
ARCADIS <br />facilities included four service bays, three dispenser islands, one sales kiosk, three <br />10,000 -gallon gasoline underground storage tanks (UST), one 1,000 -gallon used -oil <br />UST, one 550 -gallon previously abandoned used -oil UST, and one hydraulic hoist. <br />All facilities associated with the former Chevron were removed during August of <br />1998. The site is bound to the west by South Lee Avenue, to the east by South <br />Pleasant Avenue, to the south by Kettleman Lane, and to the north by residential <br />areas. The site is currently operated as a Prime Shine Express Car Wash and Auto <br />Lube Center. <br />Well Destruction and System Decommissioning Activities <br />Between March 2 and March 17, 2009, Cascade Drilling Incorporated (Cascade) of <br />Rancho Cordova, California, under the supervision of ARCADIS, destroyed 27 <br />groundwater monitoring wells (MW -1, MW -2, MW -3, MW -4, MW -5A, MW -5B, MW -6, <br />MW -7A, MW -7B, MW -8A, MW -8B, MW -8S, MW -9A, MW -9B, MW -10A, MW -10B, <br />MW -10C, MW -11A, MW -11B, MW -12A, MW -12B, MW -13, MW -17B, MW -18B, MW - <br />19C, MW -20A, and MW -20B), three groundwater extraction wells (EX -1, EX -2, and <br />EX -3) and four vapor extraction wells (VE -1, VE -2, VE -3, and VE -4). Groundwater <br />extraction well EW -1 was destroyed by removing the well box and over-drilling with <br />14 -inch outside diameter (OD) hollow stem augers (HSA) to total completion depth <br />(65 feet below ground surface [bgs]) to remove all material (e.g. casing, filter pack, <br />annular seal, etc.) associated with the well. The borehole was then pressure grouted <br />from the bottom of the bore hole to surface grade using a tremie pipe and cement <br />bentonite grout. <br />The well boxes were removed from the remaining groundwater extraction wells, <br />vapor extraction wells and all monitoring wells. The wells were then pressure grouted <br />from the bottom to surface grade using a tremie pipe and cement bentonite grout. <br />The upper 3 feet was then over-drilled using 12 -inch OD HSAs. The upper 3 feet was <br />then grouted and completed to grade with cement bentonite grout. <br />Investigative Derived Waste <br />Soil cuttings and rinsate water generated during these activities was temporarily <br />stored onsite in labeled 55 gallon drums pending characterization and disposal. On <br />April 2, 2009, soil cuttings and rinsate water were removed from the site. Soil cuttings <br />were properly disposed of at the Republic Services Vasco Road Landfill in <br />Livermore, California. Rinsate water was disposed of at Chemical Waste <br />Mr. James L.L. Barton, <br />P.G. <br />May 11, 2009 <br />1larcadis-uslofficedata\Sacramento-CAIENVICHEVROM9577516 DeliverablesTeportsMell Destruction Report195775 Well Destruction Report_316910950.doc Page: <br />2/4 <br />