My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2004-2009
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MACARTHUR
>
3400
>
2300 - Underground Storage Tank Program
>
PR0518738
>
COMPLIANCE INFO 2004-2009
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/20/2019 2:47:10 PM
Creation date
10/4/2018 2:58:46 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO 2004-2009
FileName_PostFix
2004-2009
RECORD_ID
PR0518738
PE
2361
FACILITY_ID
FA0014111
FACILITY_NAME
TRACY PETRO INC*
STREET_NUMBER
3400
STREET_NAME
MACARTHUR
STREET_TYPE
DR
City
TRACY
Zip
95376
APN
21306016
CURRENT_STATUS
01
SITE_LOCATION
3400 MACARTHUR DR
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
TMorelli
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
239
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SWRCB,January 2002 "i Page 5 of � <br /> 7. UNDER-DISPE 'SER CONTAINMENT C TESTING <br /> Test Method Developed By: D UDC M ufacturer D Industry Standard X Professional Engineer <br /> D Other( ;eco) <br /> Test Method Used: 0 Pressure'' D Vacuum X Hydrostatic <br /> D Other r.Specify) <br /> Test Equipment Used: MI S Mag Probe W/T'DU Meter Equipment Resolution: .001" <br /> UDC#0./2 UDC#3/4 UDC#5/6 UDC#7/8 <br /> UDC Manufacturer:_ AP Ih APT APT APT <br /> UDC Material Pol Poly Poly Poly <br /> UDC Depth: 32 32" 32" 32" <br /> Height from UDC Bottom to Top 131; 13" 13" 13" <br /> of Highest Piping Penetration: <br /> Height from UDC Bottom toPYes <br /> " 10" 6" 12" <br /> Lowest Electrical Penetration: __• <br /> Condition of UDC prior to <br /> testing: q, Good Good Good <br /> Portion of UDC Tested ;, 15" 15" 15" <br /> Does turbine shut down when <br /> UDC sensor detects liquid(both D NA X Yes 0 No 0 NA X Yes D No DNA X Yes 0 No DNA <br /> product and water)? ,. <br /> Turbine shutdown response time 5 Seco : s 7 Seconds 6 Seconds 6 Seconds <br /> Is system programmed for fail- <br /> safe shutdown?* X Yes 0 N(;D NA X Yes 0 No [INA X Yes 0 No DNA X Yes 0 No DNA <br /> Was fail-safe verified to be <br /> operational'?* X Yes 114 D NA X Yes 0 No DNA X Yes D No DNA X Yes D No DNA <br /> Wait time between applying <br /> pressure/vacuum/water and 10 M . 10 Min. 10 Min. 30 Min. <br /> starting test <br /> Test Start Time: 11:5 10:10 12:50 12:50 <br /> Initial Reading(Ri): 0.006, 0.000" 0.000" 0.000" <br /> Test End Time: 12:2(` 12:34 13:14 13:14 <br /> Final Reading(RF): 0.001" 0.000" 0.000" 0.000" <br /> Test Duration: 24 Mir) 24 Min 24 Min 24 Min <br /> Change in Reading(RF-Ri): .004'q; .000" .000" .000" <br /> Pass/Fail Threshold or Criteria: +/- . , +/- .004" +/- .004" +/- .004" <br /> Test Result: X Pass I Fall X Pass D Fail X Pass D Fail X Pass ❑Fail <br /> Was sensor removed for testing? _XYes 0 N ❑NA X Yes D No 0 NA X Yes 0 No D NA X Yes D No D NA <br /> Was sensor properly replaced and <br /> verified functional after testing? X Yes D Nc D NA X Yes D No 0 NA X Yes D No D NA X Yes 0 No 0 NA <br /> Comments—(include information on repairs 1 i4de prior to testing, and recommended follow-up for failed tests) <br /> ja <br /> +i <br /> {l <br /> r <br /> i <br /> If the entire depth of the UDC is not tested,speclyy how much was tested. If the answer to guy of the questions indicated with an <br /> asterisk(*)is"NO"or"NA",the entire UDC mus;be tested. (See SWRCB LG-160) <br /> M� <br />
The URL can be used to link to this page
Your browser does not support the video tag.