My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_PRE 2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
K
>
KASSON
>
22888
>
2800 - Aboveground Petroleum Storage Program
>
PR0515878
>
COMPLIANCE INFO_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/5/2019 4:51:46 PM
Creation date
10/10/2018 1:59:09 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2800 - Aboveground Petroleum Storage Program
File Section
COMPLIANCE INFO
FileName_PostFix
PRE 2019
RECORD_ID
PR0515878
PE
2834
FACILITY_ID
FA0003821
FACILITY_NAME
CHEVRON PRODUCTS COMPANY #1001621
STREET_NUMBER
22888
Direction
S
STREET_NAME
KASSON
STREET_TYPE
RD
City
TRACY
Zip
95376
CURRENT_STATUS
01
SITE_LOCATION
22888 S KASSON RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
699
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
May 2, 2012 <br />Chevron <br />22838 Kasson Rd. <br />Banta, CA <br />Attn: Zach Pecor <br />Page 47 of 179 <br />FEB 2 5 2016 <br />ENVIRON <br />ME <br />}-ir�.6l T4-� R;:pAPTM!=PIT <br />The following repairs were conducted on tank T-23 at the Chevron facility located in Banta, CA. <br />3128/12 <br />• Mark -out new 24" manway for sandblasting <br />3129/12 & 3130112 <br />Install new 24" manway <br />4112112 <br />• Install (5) square /<" patch plates with rounded corners to cover bottom pitting at the <br />locations specified by DJA Inspection report and vacuum box patches. <br />• Install telltale holes in nozzle repads D and E. (Repad at G was too small to drill hole) <br />• Modify the water draw support for seismic isolation and install 12" dia. x %" reinforcing <br />plate at the base of the support. <br />Nozzle D was a hot tap and failed the repad air test due to lack of welding around the perimeter <br />of the nozzle at the tank interior. <br />4118/12 <br />• Weld the inside perimeter of nozzle D and air test the repad. <br />Thank you for the opportunity to work with you on this project. <br />Regards, <br />Austin Moreau <br />Project Manager <br />Matrix Service, Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.