My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_PRE 2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
R
>
RIVER
>
26292
>
2800 - Aboveground Petroleum Storage Program
>
PR0516200
>
COMPLIANCE INFO_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/6/2019 1:58:55 PM
Creation date
10/10/2018 3:42:38 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2800 - Aboveground Petroleum Storage Program
File Section
COMPLIANCE INFO
FileName_PostFix
PRE 2019
RECORD_ID
PR0516200
PE
2832
FACILITY_ID
FA0009335
FACILITY_NAME
MUNN & PERKINS
STREET_NUMBER
26292
Direction
E
STREET_NAME
RIVER
STREET_TYPE
RD
City
ESCALON
Zip
95320
APN
247-22-032
CURRENT_STATUS
01
SITE_LOCATION
26292 E RIVER RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
EJimenez
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SAN JOAQUIN COUNTY <br />ENVIRONMENTAL HEALTH DEPARTMENT <br />600 East Main Street, Stockton, California 95202-3029 <br />Telephone: (209) 468-3420 Fax: (209) 468-3433 Web: www.segov.org/ehd <br />ABOVEGROUND PETROLEUM STORAGE ACT (APSA) PROGRAM INSPECTION REPORT <br />CONTINUED <br />Fame Munn & Perkins <br />Name: <br />y 26292 River Road, Escalon <br />e <br />Inspection <br />Jul 9, 2010 <br />Addres <br />Addr s: <br />Date: <br />VIOLATIONS <br /># <br />V <br />v <br />Code Section <br />HSC = CA Health and SafetyCode; CFR = Code of Federal Regulations V = Violation; RV = Repeat violation <br />Specific requirements of HSC 25270.4.5(a) are identified as CFR code sections beginning with 112 <br />Failed to: test each aboveground container for integrity on a regular schedule or when repairs were made; <br />48 <br />CFR 112.8(c)(6) <br />inspect containers and container supports; or keep records of inspections and tests, or provide <br />equivalence as allowed by CFR 112.7(a)(2) <br />49 <br />CFR 112.8(c)(7) <br />Failed to provide effective leakage control through defective internal heating coils, or provide equivalence <br />as allowed by CFR 112.7(a)(2) <br />50 <br />CFR 112.8(c)(8) <br />Failed to install and regularly test approved liquid level sensing devices, or provide equivalence as allowed <br />by CFR 11 2.7 a 2) <br />51 <br />CFR 112.8(c)(9) <br />Failed to observe effluent treatment facility frequently enough to detect system upsets that could cause a <br />discharge, or provide equivalence as allowed by CFR 112.7(a)(2) <br />52 <br />CFR 112.8(c)(10) <br />Failed to promptly correct visible discharges and/or remove accumulations of oil in diked areas, or provide <br />equivalence as allowed by CFR 11 2.7 a 2 <br />53 <br />CFR 112.8(c)(11) <br />Failed to locate portable containers to prevent discharge or provide sufficient secondary containment <br />capacity that will hold the volume of the largest container plus sufficient freeboard to contain precipitation <br />Failed to provide buried piping with a protective wrapping and coating and cathodic protection and/or <br />54 <br />CFR 112.8(d)(1) <br />inspect buried piping for corrosion damage when exposed, or provide equivalence as allowed by CFR <br />112.7 a 2 <br />55 <br />CFR 112.8(d)(2) <br />Failed to cap or blank -flange terminal connection at transfer point and mark its origin when piping is not in <br />service or in standby service for an extended time, or provide equivalence as allowed by CFR 11 2.7 a (2 <br />56 <br />CFR 112.8(d)(3) <br />Failed to design pipe supports to minimize abrasion and corrosion and to allow for expansion and <br />contraction, or provide equivalence as allowed by CFR 112.7(a)(2) <br />57 <br />CFR 112.8(d)(4) <br />Failed to regularly inspect aboveground valves, piping, and appurtenances, or provide equivalence as <br />allowed by CFR 112.7(a)(2) <br />58 <br />CFR 112.8(d)(4) <br />Failed to conduct integrity and leak test for buried piping at time of installation, modification, construction, <br />relocation, or replacement, or provide equivalence as allowed by CFR 112.7(a)(2) <br />CFR 112.8(d)(5) <br />Failed to provide adequate warnings to vehicles entering facility to protect aboveground piping and other <br />r59 <br />oil transfer o erations, or rovide a uivalence as allowed b CFR 112.7 a 2 <br />Other: <br />See attached "Continuation - Official Inspection Report" for violation(s) not listed above. <br />Notice to Comply <br />2. Facility could not locate monthly inspection report for the above ground tank as stated in the SPCC <br />plan. Facility foreman informed that daily inspection are performed. Immediately start to keep records of <br />the inspections as specified in the SPCC plan. Submit proof of corrective action to this office within 30 <br />days of receipt of the inspection report. <br />Notes <br />A copy of the return to compliance certification must be submitted to this office within 30 days of receipt of <br />the inspection report. <br />Provided free SPCC class information. <br />ALL EHD STAFF TIME ASSOCIATED WITH FAILING TO COMPLY BY THE ABOVE NOTED DATES WILL BE BILLED AT THE CURRENT HOURLY <br />RATE. THIS FACILITY IS SUBJECT TO REINSPECTION AT ANY TIME AT EHD'S CURRENT HOURLY RATE. <br />Inspector Phone: <br />Received By. <br />Title <br />4vk . i\ -1:1711v-, (209) 468-3439 <br />EHD 28-02 Rev 2/19/10 O Page APSA INSPECTION REPORT <br />
The URL can be used to link to this page
Your browser does not support the video tag.