My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_PRE 2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
B
>
B
>
1604
>
2800 - Aboveground Petroleum Storage Program
>
PR0515766
>
COMPLIANCE INFO_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/24/2019 1:54:21 PM
Creation date
10/17/2018 12:00:19 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2800 - Aboveground Petroleum Storage Program
File Section
COMPLIANCE INFO
FileName_PostFix
PRE 2019
RECORD_ID
PR0515766
PE
2832
FACILITY_ID
FA0003683
FACILITY_NAME
Caltrans-Stockton
STREET_NUMBER
1604
Direction
S
STREET_NAME
B
STREET_TYPE
St
City
Stockton
Zip
95206
APN
171-090-08
CURRENT_STATUS
01
SITE_LOCATION
1604 S B St
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
EJimenez
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
40
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SAN JOAQUIN COUNTY <br /> ENVIRONMENTAL HEALTH DEPARTMENT <br /> 600 East Main Street, Stockton, California 95202-3029 <br /> Telephone:(209)468-3420 Fax: (209)468-3433 Web:www.s'gov.org/ehd/unitiii.html <br /> CONTINUATION FORM Page: 4 of <br /> OFFICIAL INSPECTION REPORT Date: 06/29/11 <br /> Facility Address: 1604 S. B St., Stockton Program: APSA <br /> SUMMARY OF VIOLATIONS <br /> CLASS I,CLASS II,or MINOR-Notice to Comply) <br /> ROUTINE ABOVEGROUND PETROLEUM STORAGE ACT (APSA) INSPECTION <br /> "Inspection conducted on June 29, 2011. Report completed on July 1, 2011. Checklist left on site at <br /> time of inspection. <br /> Violations: (6, 18, 19, 21, 24, 27, 48, 50) <br /> 6. The Professional Engineer (PE) certification is incomplete. No statements were made regarding <br /> inspections and testing or the adequacy of the Plan. The PE certification must include all of the aspects <br /> in 40 CFR Part 112.3(d)(1), including attesting that the PE is familiar with 40 CFR 112, he or his agent <br /> has visited and examined the facility, the Plan has been prepared in accordance with good engineering <br /> practice, including consideration of applicable industry standards, procedures have been established for <br /> required inspections and testing, and the Plan is adequate for the facility. Immediately obtain a <br /> complete PE certification for the facility's Spill Prevention Control and Countermeasure (SPCC) plan. <br /> Submit a copy of the completed, certified SPCC plan to the EHD by August 1, 2011. <br /> 18. The facility map only includes the locations of the 10,000 gallon diesel tank and the two 6,000 gallon <br /> gasoline and E85 tanks. The Plan shall include a facility diagram which must mark the location and <br /> contents of each fixed storage container and the storage area where mobile or portable containers are <br /> located. It must identify the location of and mark as "exempt" underground tanks. It must also include <br /> all transfer stations and connecting pipes, including intra-facility gathering lines. Immediately update the <br /> facility diagram to include all of the required information. Submit a legible copy of the updated facility <br /> diagram to the EHD by August 1, 2011. <br /> 19, 21 & 27. The inventory listed in the SPCC Plan does not include the oil totes and 55 gallon drums. <br /> Discharge & drainage controls and potential equipment failure are not addressed for any of the unlisted <br /> containers. The SPCC Plan must include the correct type of oil and storage capacity of each fixed <br /> storage container, and either the type of oil and storage capacity of each portable container or an <br /> estimate of the potential number of portable containers, types of oil, and anticipated storage capacities. <br /> The Plan must include discharge or drainage controls, such as secondary containment around all <br /> containers and other structures, equipment, and procedures for the control of a discharge, and a <br /> prediction of the direction, rate of flow, and total quantity of oil which could be discharged as a result of <br /> each type of major equipment failure. Immediately update the inventory and discharge information in the <br /> SPCC Plan to accurately represent the petroleum storage at the facility. <br /> ALL EHD STAFF TIME ASSOCIATED WITH FAILING TO COMPLY BY THE ABOVE NOTED DATES WILL BE BILLED AT THE CURRENT HOURLY RATE($122). <br /> THIS FACILITY IS SUBJECT TO REINSPECTION AT ANY TIME AT EHD'S CURRENT HOURLY RATE. <br /> EHD Inspector: ceiv By: _ t( Title: <br /> EHD 23-02-0 3 :RJ., 8/10/10 CONTINUATION FORM <br />
The URL can be used to link to this page
Your browser does not support the video tag.