Laserfiche WebLink
04/02/2001 I3u Pont Page 3 of 5 <br /> Product Usage Data Sheet - 7160S <br /> ChromaPremierTM Sealer <br /> Prime 'N SealTM <br /> Low VOC Prime 'N SeaITM <br /> Tips for Success <br /> For information on ValueShadeTM, see the Specialty Procedures section. <br /> Surface Preparation <br /> Prepare all surfaces to be repainted using the recommended undercoat systems, <br /> following recommended procedures. Finish sand with P400 DA or P600 grit or <br /> finer (wet or dry) . <br /> Gun Setups* <br /> Conventional Spot/Panel Overall <br /> Siphon Feed: 1.4 mm - 1.6 mm ( .055" - .063") 1.6 mm - 1.8 mm ( .063" - .070") <br /> Gravity Feed: 1.4 mm - 1.6 mm (.055" - .063") 1.4 mm - 1.6 mm (.055" - .063") <br /> HVLP <br /> Siphon Feed: 1.6 mm - 1.8 mm ( .063" - .070") 1.8 mm - 2.2 mm ( .070" - .086") <br /> Gravity Feed: 1.3 mm - 1.6 mm ( .051" - .063") 1.6 mm - 1.8 mm ( .063" - .070") <br /> Air Pressure* <br /> Conventional <br /> Siphon Feed: 35 - 45 psi @ the gun. <br /> Gravity Feed: 35 - 45 psi @ the gun. <br /> HVLP <br /> Siphon Feed: 6 - 8 psi @ the gun cap. <br /> Gravity Feed: 6 - 8 psi @ the gun cap. <br /> * The listed setups cover the usual range for various application equipment. <br /> For information on specific manufacturers' equipment, see the Appendix section <br /> titled "Equipment Information. " <br /> Application <br /> Apply 2 - 3 medium coats until hiding and color match are achieved. <br /> Flash/Dry Times <br /> Flash between Coats: 5 - 10 minutes. <br /> Air Dry @ 70° F. <br /> Flash before Clearcoat: 15 - 30 minutes. <br /> Flash before Tape: 30 minutes. <br /> Flash before-Two-toning: 30 minutes. <br /> Maximum Allowable Dry before Clearcoating: Overnight. <br /> Force Dry: Not recommended. <br /> Tips for Success <br /> ■ Extend the basecoat flash to the full 30 minutes for higher film builds or <br />