Laserfiche WebLink
RECEIVE- <br />MA"% <br />U 6 2014 <br />10, SECONDARY PIPE TESTING <br />"fest Method Developed By: Piping Manufacturer 11Industry Standaal Professional Em�ineel TA , <br />❑ Other (Specify) PTA4rN T <br />Test Method Used: ❑ Pressure ❑ Vacuum ❑ Hydrostatic <br />❑ Other (Spec) <br />'lest Equipment Used: <br />Equipment Resolution: <br />Piping Run #9 <br />Piping Run # <br />Piping Rim # <br />Piping Run # <br />Piping Material: <br />Fiberglass <br />Piping Manufacturer: <br />Smith <br />Piping Diameter: <br />3" <br />Length of Piping Run: <br />Approx. 80' <br />Product Stored: <br />Diesel <br />Method and location of <br />piping -run isolation: <br />Test boot at UDC 21m <br />thru 27s <br />Wait time between applying <br />pressure and starting test: <br />Not Tested <br />See comments <br />Test Start Time: <br />Initial Reading (111): <br />Test End Time: <br />Final Reading (RF): <br />Test Duration: <br />Change in Reading (RF-Rj): <br />Pass/Fail Threshold or <br />Criteria: <br />Test Result: <br />Not Tested <br />Comments —(include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />Piping Run #9 not tested. Recent Dispenser upgrade and addition of Bravo conversion to UDC's, has made access to <br />Secondary Components, ie: Test Seal off Boots inaccessible. <br />Unable to reach into UDC's at truck island in current configurations and operating conditions, to connect testing apparatus. <br />Unable to perform Hydrostatic testing of Truck Island UDC's in current configuration. <br />Restricted access in current configuration of UDC's pose a hindrance for Hydrostatic testing of UDC's. <br />Recommend replacement of current UDC's at truck islands, with a larger configuration to allow required routine testing. <br />