My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AIRPORT
>
2255
>
3500 - Local Oversight Program
>
PR0518431
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/23/2018 8:54:51 AM
Creation date
10/23/2018 8:12:23 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0518431
PE
3528
FACILITY_ID
FA0013904
FACILITY_NAME
ZE AUTO REPAIR
STREET_NUMBER
2255
Direction
S
STREET_NAME
AIRPORT
STREET_TYPE
WAY
City
STOCKTON
Zip
95206
APN
16908055
CURRENT_STATUS
02
SITE_LOCATION
2255 S AIRPORT WAY
P_LOCATION
01
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
162
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
�- Page ] of 1 <br /> U,c <br /> Frank Girardi [EH] <br /> _ From: Rex Smith [RSmith@horizonenvironmental.net] <br /> Sent: Tuesday, March 11, 2008 3:46 PM <br /> To: Frank Girardi [EH] <br /> Subject: Ultramar Site 13792, 2255 Airport Way, Stockton <br /> Importance. High <br /> Attachments: SJCEHD Permit Applic final.pdf <br /> Mr. Girardi: <br /> Regarding the subject site: Horizon has now secured revocable and encroachment permits from Stockton City for <br /> installation of the 3 off-site monitoring wells approved in your 24 September and 31 December 2007 letters. The <br /> on-site deep monitoring well was also approved in the 24 September letter. <br /> Horizon submitted a work plan to EHD on 12 February 2008 for 3 on-site vapor wells. Horizon would like to install <br /> these wells during the same mobilization as the monitoring wells. When can we expect your approval of the <br /> vapor well work plan? The vapor extraction system is shut off pending installation and hookup of the proposed <br /> vapor wells. <br /> Horizon is submitting permit applications (see attached)today for the 4 monitoring wells and the 3 vapor wells. <br /> The fieldwork/drilling is currently scheduled for March 24-26 2008 in accordance with your directive in the 31 <br /> December 2007 letter. This drilling date is a week from Monday next. <br /> Please inform Horizon of the results of your vapor well work plan review and advise Horizon if the drilling <br /> schedule can be kept. <br /> Rexford Smith <br /> Professional Geologist No. 5307 <br /> HORIZON ENVIRONMENTAL INC. <br /> 4970 Windplay Drive, Suite 5 <br /> El Dorado Hills, California 95762 <br /> (916)939-2170 <br /> (916)939-2172 FAX <br /> 3/12/2008 <br />
The URL can be used to link to this page
Your browser does not support the video tag.