My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0000089
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AIRPORT
>
2651
>
3500 - Local Oversight Program
>
PR0543371
>
ARCHIVED REPORTS XR0000089
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/23/2018 3:23:11 PM
Creation date
10/23/2018 1:10:54 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS XR0000089
FileName_PostFix
XR0000089
RECORD_ID
PR0543371
PE
3528
FACILITY_ID
FA0006174
FACILITY_NAME
Best Express Foods Inc.
STREET_NUMBER
2651
Direction
S
STREET_NAME
AIRPORT
STREET_TYPE
WAY
City
STOCKTON
Zip
95206
APN
16912003
CURRENT_STATUS
02
SITE_LOCATION
2651 S AIRPORT WAY
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• 5.4 Trailer Connection 17 <br />' The power supply to the trailer will be provided by a 25 KV -A <br />generator connected to the control panel in the trailer. <br />The vent and sparge wells will be connected to the trailer <br />header piping with 2 -inch and 1.5 -inch flexible hose respectively. <br />5.5 Equipment Startup <br />After connection of the trailer to the power supply and the <br />' test wells, start-up of the system should follow the steps <br />described below. Only venting unit B-1 and sparging unit B-3 will <br />' be used for the pilot test. <br />1. open the atmosphere valves on venting and sparging units B-1 <br />and B-3 to full open and close the in-line valves on venting <br />and sparging units B-2 and B-4. <br />2. Adjust the valves to vent and sparge wells to full open. <br />3. Energize the power supply to the control panel in the <br />equipment trailer. <br />4. Switch the Hand -Off -Auto (HOA) controls to automatic for <br />blowers B-1 and B-3 and to off for B-2 and B-4. <br />Y <br />5. <br />Press the system start button. Delay timers in the control <br />panel will start Blower B-1 then Blower B-3. <br />6. Slowly close the atmosphere valves on the vent and sparge <br />blowers until fully closed. <br />' 7. Adjust the valves to the vent and sparge wells to obtain the <br />desired flow rate to/from each of the wells as indicated by <br />the flow meters. <br />If the flow meter on the exhaust stack of Blower B-1 begins to <br />bounce, slowly close the exhaust stack valve until the readings <br />stabilize. Slowly open the exhaust stack valve until the maximum <br />flow is obtained and while keeping the flow meter reading stable. <br />07/94/12082112599WREM REM July 1, 1994 9 26am <br />
The URL can be used to link to this page
Your browser does not support the video tag.