Laserfiche WebLink
h <br /> a <br /> . 1 2 2 Preliminary Investigation and Evaluation <br /> On March 26, 1996, IT Corporation published Site Invest►gat►on Report, which documented the <br /> results of soil and groundwater-grab sampling from two on-site Geoprobe soil borings (SB-3 and <br /> SB-4) Two additional soil borings (SB-1 and SB-2) were terminated at the buried concrete slab <br /> beneath the former USTs The boring locations are shown on Figure 2 <br /> Soil androundwater beneath the northwest side of the former USTs were impacted b petroleum <br /> g p Y <br /> hydrocarbons The soil sample analytical results are summarized in Table 3, and the groundwater <br /> analytical results are summarized in Table 4 <br /> r <br /> 1 <br /> i <br /> 1• <br /> 1 <br /> 1 <br /> 1 <br /> 1 <br /> 1 <br /> 1 <br /> 1 <br /> • 6 <br /> 1 <br />