My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
A
>
AIRPORT
>
8010
>
2900 - Site Mitigation Program
>
PR0526994
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/24/2018 1:52:06 PM
Creation date
10/24/2018 11:47:43 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0526994
PE
2957
FACILITY_ID
FA0018291
FACILITY_NAME
FMS #24 (OMS)
STREET_NUMBER
8010
Direction
S
STREET_NAME
AIRPORT
STREET_TYPE
WAY
City
STOCKTON
Zip
95206
APN
17726029
CURRENT_STATUS
01
SITE_LOCATION
8010 S AIRPORT WAY
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
73
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
9 0 <br />John Yoakum [EH] <br />From: Alex Bowerman <ABowerman@otie.com> <br />Sent: Friday, September 06, 2013 1:01 PM <br />To: John Yoakum [EH] <br />Cc: Michael Quillin; Suman Sharma; James Lenzen; Lik-See Chung <br />Subject: Field Work Schedule - ISCO/ORC Injections_Stockton, CA <br />Johnny, <br />We have finalized the schedule for our upcoming ISCO and ORC injections at Field Maintenance Shop #24 (FMS) and the <br />Army Aviation Support Facility (AASF). The permit numbers for the injection borings at FMS#24 and AASF are 67858 and <br />67859, respectively. Due to limited subcontractor availability (ISOTEC is based out of the east coast) and client budgetary <br />concerns, the injections at the FMS and AASF sites must be completed in one mobilization extending through the <br />weekend of September 28 and 29, 2013. The schedule is provided below: <br />Monday 9/23: Mobilization/ Equipment set-up <br />Tuesday 9/24: FMS Injections <br />Wednesday 9/25: FMS Injections <br />Thursday 9/26: FMS Injections <br />Friday 9/27: FMS Injections <br />Saturday 9/28: FMS Injections <br />Sunday 9/29: FMS Injections <br />Monday 9/30: AASF Injections <br />Tuesday 10/01: AASF Injections (if needed), or else Demobilization <br />Wednesday 10/02: Demobilization <br />We would like to work with you to put together a grout inspection schedule that wiH batt% meet the County's <br />requirements and minimize any unnecessary inconvenience during the weekend. Pleaw :site a look at the schedule and <br />let us know how you would like to proceed. <br />We apologize for any inconvenience this may cause. <br />Feel free to contact us if you have any questions. <br />Thanks again, <br />Alex S. Bowerman, P.E. <br />Project Engineer <br />Oneida Total Integrated Enterprises (OTIE) <br />1777 N. California Blvd., Suite 310 <br />Walnut Creek, CA 94596 <br />925.906.9698, ext. 2226 office <br />510.704.3889 cell <br />925.906.9678 fax <br />www.otie.com <br />Engineering, Science and Construction <br />
The URL can be used to link to this page
Your browser does not support the video tag.