Laserfiche WebLink
Revised LFR Levine Fricke <br /> groundwater into the SVEortia <br /> p n of the well The well head will be secured with a <br /> locking, waterproof well cap and tamper-resistant H-20 traffic-rated vault Figure 10 <br /> depicts the proposed well construction details <br /> Partially Screened Well: The partially screened extraction wells, PSEW-4, 5, and 6 <br /> and PSEW-7, 8, and 9 will be built in a borehole drilled using hollow-stern augur <br /> drilling techniques because these wells are not located in vadose zone source areas <br /> They will be constructed using 4-inch-diameter PVC casings <br /> Well Cluster PSEW-4, S,and 6: Well cluster PSEW-4, 5, and 6 will each be <br /> constructed with one shallow well screen within the vadose zone and one deep well <br /> screen within the saturated zone, as follows- <br /> • PSEW-4 will have one well screen from 10 to 20 ft bgs and the second from 50 to <br /> 75 ft bgs <br /> • PSEW-5 will have one well screen from 20 to 30 ft bgs and the second from 50 to <br /> 75 ft bgs <br /> • PSEW-6 will have one well screen from 30 to 40 ft logs and the second from 50 to <br /> 75 ft bgs <br /> Well Cluster PSEW-7, 8,and 9: PSEW-7 and PSEW-8 will be constructed with well <br /> . screens from 10 to 20 ft bgs and 20 to 30 ft bgs PSEW-9 will have two well screens, <br /> one from 30 to 40 ft bgs within the vadose zone, and the lower well screen from 50 to <br /> 75 ft bgs within the saturated zone <br /> Vadose Zone Well Screens: The screen intervals will be constructed so as to rwnumze <br /> the potential for cross contaimnation, and to mulinti2e potential for air leakage from the <br /> ground surface Well screens will consist of 0 I25-inch slots and medium-grained sand <br /> filter pack to maximize anflow rates <br /> Saturated Zone Well Screens: Each of the wells in well cluster PSEW-4, 5, and 6 and <br /> well PSEW-9 will have well screens between 50 and 75 ft legs The shallow and the <br /> deep screened intervals will be separated by a blank section of PVC pipe, and a packer <br /> will be installed to mitigate the potential for flow of groundwater alto the soil vapor <br /> extraction portion of the well The well head will be secured with a locking, waterproof <br /> well cap and tamper-resistant H-20 traffic-rated vault, <br /> 5.2 SVETS Installation for Pilot Testing Purposes <br /> As discussed above, LFR is proposing to perform a pilot test using the proposed SVE <br /> wells As such, LFR proposes to install a SVE system to treat extracted vapor prior to <br /> atmospheric discharge The initial treatment system for the Phase I test will be a vapor <br /> phase carbon adsorption system_ <br /> Mr SVEGSLodi rev-M123 clue Ifr Page I3 <br /> Ob/ZT d eC T 0091760E T 01 9060 ES9 Otis 3AO I N-J 3N I n31 X131 N_j LE 9T Eo, 60 7nr <br />