My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0001782
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CHURCH
>
17
>
2900 - Site Mitigation Program
>
PR0506167
>
ARCHIVED REPORTS XR0001782
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/25/2018 10:44:54 AM
Creation date
10/25/2018 10:30:32 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS XR0001782
FileName_PostFix
XR0001782
RECORD_ID
PR0506167
PE
2959
FACILITY_ID
FA0007245
FACILITY_NAME
GUILD CLEANERS
STREET_NUMBER
17
Direction
S
STREET_NAME
CHURCH
STREET_TYPE
ST
City
LODI
Zip
95240
APN
04303206
CURRENT_STATUS
01
SITE_LOCATION
17 S CHURCH ST
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
52
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
LFR Levine-Fricke Revised <br /> Once the data required to assess thea applicability,ty, e ffectiveriess, and costs of the <br /> combined SVE/GOS technology for the Site has been collected, the Phase IV pilot test <br /> will be terminated <br /> 8.5 Phase IV Data Analysis <br /> After completion of the Phase IV SVE/GOS pilot test, the following will be performed <br /> • calculate the area of influence of the ozone spargnng wells <br /> • assess the effectiveness of the GOS in reducing concentrations within the <br /> gxoundwater <br /> 9.0 FIELD SAMPLING PLAN AND QUALITY ASSURANCE PROTOCOLS <br /> LFR will perform the required dual completion well mstallattion, groundwater sample <br /> collection, soil vapor sample collection, and other field activities following the <br /> guidelines of the Field Sampling Plan presented in Appendix A of the "Draft Remedial <br /> Investigation and Feasibility Study Work Plan (RI/FS Work Plan), Lodi, California," <br /> dated April 29, 2002 (LF 2002) A brief description of the protocol to be followed to <br /> complete the field activities relevant to the Pilot Study is presented below <br /> 9.1 SAMPLING STRATEGY AND <br /> APPROACH <br /> The field activities will consist of the following. <br /> • determining locations of underground utilities <br /> • installing dual completion wells using either a hollow-stem auger or air rotary <br /> casing hammer rig <br /> • dual completion well development <br /> • constructing the required SVE/GAS/GOS system <br /> • shakedown and startup of the SVE/GAS/GOS system <br /> collecting sort vapor and groundwater samples during the performance of Phase 1, <br /> Phase IT, and Phase 111 pilot tears (see below) <br /> A description of the protocol to be followed during implementation of field activities is <br /> presented in Section 8 2. In addition to this description, LFR will request the contractor <br /> selected to install the SVE/GAS/GOS system to provide a quality assurance plan prior <br /> to field construction. <br /> i <br /> M&zs wpsvEcs.LA3di-rev-0s123 as Mfr <br /> Bc�ibO d 8RToV9VGozT 01 906V ZS9 OTS 3NOIN3 3NIA31 Nan N3 Bb 9T Z0, 60 inn <br />
The URL can be used to link to this page
Your browser does not support the video tag.