Laserfiche WebLink
ACDEH,August 2003 Page of <br /> 6. PIPING SUMP TESTING <br /> Test Method Developed By: ❑Sump Manufacturer ❑Industry Standard Professional Engineer <br /> ❑Other(Spec) <br /> Test Method Used: ❑Pressure ❑Vacuum Hydrostatic <br /> ❑Other(Spec) <br /> Test Equipment Used:In-Con TS-STS Equipment Resolution: <br /> Sump# L —o) Sump# -41- j Sump# Sump# <br /> Sump Diameter: �r <br /> Sump Depth: <br /> Sump Material: FZP <br /> Height from Tank Top to Top of <br /> Highest Piping Penetration. <br /> Height from Tank Top to Lowest <br /> Electrical Penetration: Z " LZ " <br /> Condition of sump prior to testing: Oi <br /> Depth of Sump Tested <br /> Does turbine shut down when <br /> sump sensor detects liquid(both Yes ❑No ❑NA Yes 11 No NA ❑Yes ❑No ❑NA ❑Yes ❑No [INA <br /> product and water)?` 11 <br /> Turbine shutdown response time <br /> Is system programmed for fail-safe <br /> shutdown?` X Yes ❑No ❑NA JI Yes ❑No ❑NA ❑Yes ❑No ❑NA ❑Yes ❑No ❑NA <br /> Was fail-safe verified to be <br /> op erational?` ❑Yes P No ❑NA ❑Yes yWo ❑NA ❑Yes ❑No ❑NA ❑Yes ❑No ❑NA <br /> Wait time between applying <br /> pressure/vacuum/water and starting 6 <br /> test: <br /> Test Start Time: <br /> Initial Reading(Rj): <br /> Test End Time: <br /> Final Reading(RF): <br /> Test Duration: <br /> Change in Reading(RF-Rj): ., 00C" <br /> Pass/Fail Threshold or Criteria: 'O07-1r aiz_ <br /> Test Result: <br /> Pass ❑Fail Pass ❑Fail ❑ Pass ❑Fail ❑ Pass ❑Fail <br /> Was sensor removed for testing? Yes ❑No ❑NA AYes ❑No ❑NA ❑Yes ❑No ❑NA ❑Yes ❑Na ❑NA <br /> Was sensor properly replaced <br /> v after testin ? 'Yes El No ❑NA B.Yes ❑No ❑NA ❑Yes ❑No [INA ❑Yes ❑No ❑NA <br /> Comments—(include information on repairs made prior to testin , and recommendedfollow-u for failed tests) <br />