My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_PRE 2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CENTER
>
535
>
2200 - Hazardous Waste Program
>
PR0513859
>
COMPLIANCE INFO_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2020 4:11:46 AM
Creation date
10/31/2018 11:47:08 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2200 - Hazardous Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
PRE 2019
RECORD_ID
PR0513859
PE
2220
FACILITY_ID
FA0009476
FACILITY_NAME
PG&E: Stockton Gas Plant
STREET_NUMBER
535
Direction
S
STREET_NAME
CENTER
STREET_TYPE
St
City
Stockton
Zip
95203
APN
137-320-02, 04
CURRENT_STATUS
01
SITE_LOCATION
535 S Center St
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\dsedra
Supplemental fields
FilePath
\MIGRATIONS\C\CENTER\535\PR0513859\COMPLIANCE INFO 2018 - PRESENT.PDF
QuestysFileName
COMPLIANCE INFO 2018 - PRESENT
QuestysRecordDate
3/27/2018 5:56:21 PM
QuestysRecordID
3836769
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
523
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
f <br /> 1 ;PG&E within 30 days after the end of the public comment period. <br /> I. <br /> 2 Upon approval for the revised RAP by the Department, it shall be <br /> 31 <br /> considered the Final RAP. PG&E has not waived and expressly <br /> 411reserves those rights set forth in Paragraph 3 . 14 <br /> 5 3 . 3 . 3 . Preparation of Remedial Action Workplan. As specified in <br /> 61the schedule included as part of the RAP and after the Department' s ' <br /> 7 � approval of the final RAP for the Site in accordance with Health andl <br /> 8 Safety Code Section 25356. 1, PG&E shall submit to the Department for <br /> 9 review and approval a detailed Remedial Action Workplan for the Sitel <br /> 10containingtechnical and operational plans and engineering designs <br /> 11 <br /> for implementation of the approved remedial or removal action <br /> 12 alternative(s) , and a schedule for implementing the construction <br /> 13 phase. All engineering designs shall include detailed construction <br /> 141plans and specifications, as well as design calculations. Any <br /> 15 Remedial Action Workplan shall also describe the nature and design <br /> 16 of the construction equipment to be employed, a site-specific <br /> 17 hazardous waste transportation plan (if necessary) , the identity of <br /> 181 any contractors, transporters and other persons conducting the <br /> I <br /> lgremoval and remedial activities for the Site, post-remedial sampling <br /> 20 and monitoring procedures for air, soil , surface water and ground <br /> 21 water, operation and maintenance procedures and schedules, and shall <br /> 22 cover all of the subjects described in subparagraphs 3 . 1. 3 ' <br /> 23a. (project management) , c. (sampling) , d. (QA/QC) , e. (data <br /> 24i management) , and f. (health & safety) and Paragraph 3 . 2 (public <br /> 25iparticipation) as they pertain to the removal , remedial, and <br /> 261 operation and maintenance activities. The schedule submitted with <br /> 27I the Remedial Action Workplan for the Site shall provide as a goal <br /> -APER 23 <br /> CALIFORNIA <br /> REV. ..72 <br />
The URL can be used to link to this page
Your browser does not support the video tag.