My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_PRE 2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
CENTER
>
535
>
2200 - Hazardous Waste Program
>
PR0513859
>
COMPLIANCE INFO_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2020 4:11:46 AM
Creation date
10/31/2018 11:47:08 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2200 - Hazardous Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
PRE 2019
RECORD_ID
PR0513859
PE
2220
FACILITY_ID
FA0009476
FACILITY_NAME
PG&E: Stockton Gas Plant
STREET_NUMBER
535
Direction
S
STREET_NAME
CENTER
STREET_TYPE
St
City
Stockton
Zip
95203
APN
137-320-02, 04
CURRENT_STATUS
01
SITE_LOCATION
535 S Center St
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\dsedra
Supplemental fields
FilePath
\MIGRATIONS\C\CENTER\535\PR0513859\COMPLIANCE INFO 2018 - PRESENT.PDF
QuestysFileName
COMPLIANCE INFO 2018 - PRESENT
QuestysRecordDate
3/27/2018 5:56:21 PM
QuestysRecordID
3836769
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
523
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> ISI <br /> I <br /> I <br /> 1I;& Safety Code Sections 25356 . 1 (d) and 25358 .7 (b) The Department <br /> i <br /> 2 (shall review the Public Participation Plan and either approve it as <br /> 3 ,submitted or provide comments in writing to PG&E on how it must be <br /> 4 changed and PG&E shall implement it as approved by the Department. <br /> 5 !If necessary prior to finalization of the Public Participation Plan, <br /> 6 PG&E shall take preliminary public participation actions to meet <br /> 7 immediate public concerns. <br /> 8 3 . 3 . Remedial Action Plan (RAP) . <br /> 9 3 . 3 . 1. Draft Remedial Action Plan. Within 90 days of Department <br /> 10 approval of the RI and FS reports, PG&E shall prepare and submit to <br /> i <br /> 11 the Department for review and approval a draft Remedial Action Plan <br /> 12 (WRAP") for the Site described in Paragraph 1. 2 which is based on <br /> 13 Le approved Remedial Investigation and Feasibility Study Reports. <br /> 14 The draft RAP shall set forth in detail appropriate steps to remedy <br /> 15 hazardous substances in air, soil , surface water and ground water at <br /> 16 the Site and adjacent areas which have been affected by hazardous <br /> 171 substances emanating from the Site. The draft RAP shall be prepared <br /> I <br /> 181in accordance with the standards and requirements set forth in <br /> 19iHealth and Safety Code Section 25356 . 1, with the exception of the <br /> i <br /> 20 , nonbinding preliminary allocation of responsibility, which shall be <br /> 21 prepared by the Department. In addition, the draft RAP shall <br /> 22 : contain a schedule for implementation of all proposed removal and <br /> 23 , remedial actions. <br /> 24 ; 3 . 3 . 2 . Final Remedial Action Plan. Following the close of the <br /> 25 I I 30 day public comment period on the draft RAP, the RAP shall be <br /> 26revised by PG&E as needed to address significant public comments as <br /> 27 determined by the Department. The revised RAP shall be submitted by <br /> �.A PER it 22 <br /> CA LIORNIA <br /> (REV. B•721 <br />
The URL can be used to link to this page
Your browser does not support the video tag.