My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 1986 - 2009
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
F
>
FRANK WEST
>
152
>
2200 - Hazardous Waste Program
>
PR0539866
>
COMPLIANCE INFO 1986 - 2009
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/5/2018 10:46:00 AM
Creation date
10/31/2018 4:05:06 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2200 - Hazardous Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
1986 - 2009
RECORD_ID
PR0539866
PE
2230
FACILITY_ID
FA0022802
FACILITY_NAME
CIRCUIT WORKS INC
STREET_NUMBER
152
STREET_NAME
FRANK WEST
STREET_TYPE
CIR
City
STOCKTON
Zip
95206
CURRENT_STATUS
02
SITE_LOCATION
152 FRANK WEST CIR
P_LOCATION
01
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\F\FRANK WEST\152\PR0539866\COMPLIANCE INFO 1986 - 2009.PDF
QuestysFileName
COMPLIANCE INFO 1986 - 2009
QuestysRecordDate
3/1/2018 7:35:35 PM
QuestysRecordID
3811873
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
248
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SENT BY=THE COPY CENTER <br />;10-31-93 1 <br />• <br />14PM ; <br />12094640138;# 7/ 9 <br />• <br />WE[ PLAN FM PLATING LINE EQ9U4ffl T RMOVAL <br />CIRCUIT WOM, INC., ST00", P.ALTPOML <br />sITE SPSCIl*tC HEALTH AND SAFETY PLAN <br />The purpose of this site specific Health and Safety Plan is to provide <br />the field personnel and visitors with an understanding of the potential <br />chemical and physical hazards that exist or may exist during the <br />performance of the decontamination of the plating line equipment. <br />The areas of concern are: <br />1. Removal of hazardous wastes from equipment (if required) <br />2. Triple rinsing of equipment. <br />3_ Removal and druming of liquids. <br />PRQJWT SAVM PERSONNSI. <br />This site specific Health and Safety Plan will be enforced by the on- <br />site project manager, Steve Mueller of Omni Environmental Group. <br />His responsibilities include but are not limited to: <br />a. Maintaining safety equipment supplies. <br />b. Direct decontamination operations and emergency response <br />operations if required. <br />c. setting up work zones, markers, and signs. <br />d. Reporting any problems or infractions of safety rules. <br />SCHEWLE <br />We anticipate that the dcontamination process will take approximately <br />One (1) working day to complete. <br />we anticipate that the acutal equipment removal will take one Cl) <br />working day to complete. <br />SITE SAFETY RECOMEMATIONS' <br />Hazard Determination <br />serious Moderate X Low Unknown <br />A modified Level C to upgrade to Level C if air contaminate levels <br />exceed 5Oppm. <br />The minimum acceptable level of protection is a Modified Level C. <br />Respirators will be worn insude the plating room during the decontamination. <br />4.. <br />
The URL can be used to link to this page
Your browser does not support the video tag.