Laserfiche WebLink
DVRL'.1 E <br />CH <br />Running belt, the belt to see if there is deviation phenomenon, if there is deviation <br />phenomenon, adjust the belt rollers the belt runs to the middle position (see 30.4 adjustment <br />method), and should remain stable for 30 minutes or more before the operation; <br />Lzi <br />1T—VVC RihAP-5�ITJa, <br />Vortex rotor drive system powered operation, the operation speed should be low to high, and <br />gradually increase in a certain time of operation speed, stable operation confirmation before <br />continuing speed; <br />iF-PfPRI- <br />Commissioning process, such as equipment vibration pads should be adjusted to the thickness <br />of the block and tighten the bolt, until the vibration is reduced to the permitted limits. <br />010,3 0&01 A N44; <br />To Inject a small amount of material in the hopper, observe the material conditions, adjust the <br />angle plate, after sorting effect is achieved, please lock the plate locknut. <br />Eddy current sorting machine starts running, you should firstly start the eddy current <br />sorting machine belt drive motor, and then start the vortex rotor drive motor, and finally start <br />the feeder motor; <br />When the Eddy current sorting machine are no work, please firstly stop the motor feeder, and <br />then stop the vortex rotor drive motor, finally stop the belt drive motor. The sequence in <br />reverse order starting with the device. <br />127 <br />