My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2007-2011
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
C
>
COLONY
>
1553
>
2300 - Underground Storage Tank Program
>
PR0516526
>
COMPLIANCE INFO 2007-2011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/24/2019 4:45:49 PM
Creation date
11/1/2018 10:33:13 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO 2007-2011
FileName_PostFix
2007-2011
RECORD_ID
PR0516526
PE
2361
FACILITY_ID
FA0012659
FACILITY_NAME
LOVE'S COUNTRY STORES OF CALIF #223
STREET_NUMBER
1553
STREET_NAME
COLONY
STREET_TYPE
RD
City
RIPON
Zip
95366
APN
24534024
CURRENT_STATUS
01
SITE_LOCATION
1553 COLONY RD
P_LOCATION
05
P_DISTRICT
005
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
194
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SWRCB,January 2002 Page_ of <br /> 5. SECONDARY PIPE TESTING <br /> Test Method Developed By: X Piping Manufacturer 0 Industry Standard 0 Professional Engineer <br /> D Other(Sped) <br /> Test Method Used: X Pressure t::! Vacuum 0 Hydrostatic <br /> rt Other(Spec) a <br /> Test Equipment Used. Pressu►e Gauges in PSI/Nitrogen Equipment Resolution 1/10-15 PSI <br /> Piping Run #5 Piping Run #6 Piping Run # 7 Piping Run # 8 <br /> Piping Material: Fiberglass Fiberglass Fiberglass Fiberglass <br /> Piping Manufacturer: Smith Smith Smith Smith <br /> I <br /> Piping Diameter: 4" 4" 3" 3" <br /> p Length of Piping Run: Approx. 12' Approx. 12' Approx.270' Approx.30' <br /> Product Stored: Diesel Siphon Diesel Manifold Diesel auto island Regular Siphon <br /> Method and location of Test boot at STP#I & Test boot at STP#1 & Test boot at STP 92 Test boot at STP 93& <br /> P P g- <br /> i in run isolation: STP#2 STP#2 &2 DC's 17,18,19, piping Sump#9 j <br /> Wait time between applying 30 Minutes 30 Minutes 30 Minutes 30 Minutes 8 <br /> pressure and starting test: _! <br /> Test Start Time: 12:50 12:40 1:00 1:10 <br /> Initial Reading(Ri): 5 Psi 5 Psi 5 Psi 5 Psi <br /> Test End Time: 1:50 1:40 2:00 2:10 <br /> Final Reading(RF): 5 Psi 5 Psi 5 Psi SPsi <br /> Test Duration: I Hour 1 Hour I Hour I Hour <br /> Change in Reading(RF-Ri): 0 Psi 0 Psi 0 Psi 0 Psi <br /> P ass/Fail"T'hreshold or No Loss in Psi No Loss in Psi No Loss in Psi No Loss in Psi <br /> Criteria: _ _ <br /> 'Test Result: X Pass ❑ Fail 7 X Pass ❑Fail X Pass ❑Fail j X Pass Fail <br /> Comments— (include information on repairs made prior to testing, and recommendedlow-up for ailed tests) <br /> Page 5 of 17 <br />
The URL can be used to link to this page
Your browser does not support the video tag.